Similar Projects
South Central Headworks WWTP Concrete Channel Rehabilitation
New Construction
Bidding
Douglasville, GA

Screening System for WWTP Headworks
New Construction
Bidding
Valdosta, GA 31601

FY 2019 Southeast WWTP Improvements Phase II
Post-Bid
Douglas, GA 31533

Baconton Wastewater Treatment Plant Improvements
Post-Bid
Less than $175,000 est. value
Baconton, GA 31716

North WPCP Improvements
Results
Hawkinsville, GA

James Creek Building Repairs
Results
Less than $63,030 est. value
Suwanee, GA 30024

Middle Oconee WRF Maintenance Building
New Construction
Construction
Less than $1,345,000 est. value
Athens, GA 30606

Jack's Creek Wastewater Treatment Plant Rehabilitation
New Construction
Bidding
Less than $5,575,000 est. value
Monroe, GA

Biosolids System Improvements - Digester Covers
Post-Bid
Augusta, GA 30901

Operation and Maintenance Services for Wastewater Facilities and Pump Stations in the North Fulton Service Area
Results
Atlanta, GA

Wahoo Creek WRF Sludge Dewatering Upgrades
Renovation
Bidding
Newnan, GA 30263

Mill Creek Water Pollution Control Plant
Post-Bid
Chatsworth, GA 30705

Rubes Creek Water Reclamation Facility Dewatering Building Modifications Project
Renovation
Results
Woodstock, GA

Bioxide Odor and Corrosion Control
Term Contract
Post-Bid
Savannah, GA 31400

WWTP Influent Screening Equipment
Results
Waycross, GA 31501

Reported 04/30/2021 12:00 AM
Project Title

SCWRF Vent and Flare System

Physical Address View project details and contacts
City, State (County) Columbus, GA 31901   (Muscogee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the rehabilitation of the Columbus Water Works South Columbus Water Resource Facility (SCWRF) Vent and Flare System, including the removal and replacement of the flares and ignition system, 6” check valves, 6” regulator, 6” flame arrestor, ½” stainless steel sensing line, drip traps, and blower and control panels.

Details

Sewage Treatment Plant, New Construction.
Division 08 - Openings, Vents.
Division 40 - Process Integration, Bulk Materials Valves.
Division 44 - Pollution and Waste Control Equipment, Gaseous Air Pollution Control Equipment, Flare Oxidation Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents