Similar Projects
Encompass Health Mental Health Center Building
New Construction - 6,500 SF
Design
Less than $2,000,000 est. value
Sioux Falls, SD 57108

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Avera Behavioral Heath Center
New Construction - 59,000 SF
Construction
$28,000,000 est. value
Sioux Falls, SD 57108

Avera Behavioral Heath Center
New Construction - 59,000 SF
Construction
$28,000,000 est. value
Sioux Falls, SD 57108

Avera Family Health Center
New Construction - 86,000 SF
Pending Verification
Sioux Falls, SD 57110

Avera Behavioral Health Center Wing
Addition
Pending Verification
$28,000,000 est. value
Sioux Falls, SD 57108

Kirby Place Patient and Family Lodging
New Construction - 6,500 SF
Construction
$3,300,000 est. value
Sioux Falls, SD

Reported 09/01/2021 12:00 AM
Project Title

Crisis Stabilization

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes civil, structural, architectural, mechanical and electrical work. The new building is approximately 13, 998 SF. The work includes, but not limited to: parking lot work, site work, utility connections, irrigation system, landscaping, brick, metal wall panels, metal stud framed gypsum board partitions, insulation, plastic laminate casework, stainless steel kitchen equipment, interior finishes, electric fireplaces, membrane roofing, aluminum storefront, glazing, hollow metal doors and frames, wood doors, door hardware, painting, sprinkler system, security/door access system, electrical and mechanical work and other items

Details

Medical Office/Outpatient, 13,998 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents