Similar Projects
Memorial Drive Sidewalk Improvements - 113081 - City Of Atlanta
Infrastructure
Conception
$177,462 CJ est. value
Decatur, GA 30032

Memorial Drive Sidewalk Improvements - 113081 - City Of Atlanta
Infrastructure
Conception
$177,462 CJ est. value
Decatur, GA 30032

Driveway Improvements for Model Elementary, Middle, and High School
Infrastructure
Design
$750,000 CJ est. value
Rome, GA 30161

Driveway Improvements for Model Elementary, Middle, and High School
Infrastructure
Design
$750,000 CJ est. value
Rome, GA 30161

RFP D/B - I-85 at SR 42/North Druid Hills Road
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Atlanta, GA 30329

RFP D/B - I-85 at SR 42/North Druid Hills Road
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Atlanta, GA 30329

2021 T-Splost Asphalt Paving
Post-Bid
Elberton, GA

Greenway Maintenance as Needed
Infrastructure
Post-Bid
GA

EP-177 Washington Road Sidewalks
Results
East Point, GA

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 3 and 4
Results
Atlanta, Dahlonega, Dunwoody, Hampton, Irondale, Jonesboro, LaFayette, Riverdale, Roswell, GA 30525

Port of Savannah - Georgia Ports Authority
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$205,000,000 CJ est. value
Port Wentworth, GA 31407

Memorial Drive Grocery Store
New Construction, Infrastructure - 29,100 SF
Pending Verification
$6,000,000 CJ est. value
Atlanta, GA 30317

Monroe Drive Intersection Improvements at 10th Street and Armour Drive - 300222 - City of Atlanta
Infrastructure
Conception
$585,000 CJ est. value
Atlanta, GA 30306

SR 56 From SR 24 to SR 121 Bypass
Infrastructure
Design
$700,000 est. value
Waynesboro, GA 30830

RFQ Construction Manager at Risk - Blue Ridge Expansion, Phase II
Addition, Demolition, Infrastructure
Bidding
$10,725,000 CJ est. value
Blue Ridge, GA 30513

Last Updated 08/30/2022 01:01 AM
Project Title

Renovation of Building 14

Physical Address View project details and contacts
City, State (County) Byron, GA 31008   (Peach County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $149,587 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Aug 22, 2022 Contract Award Number: 12405B22C0019 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: C3BKD1R9DKQ3 Contractor Awarded Name: MSAB LLC Contractor Awarded Address: Perry, GA 31069-9246 USA Base and All Options Value (Total Contract Value): $149587.48 Additional Questions: Q1: Will there be any design services required for this project, whether it be generation of construction documents or as-builts A1: Just a basic design of how the wall will be constructed, location of outlets and location of HVAC system Q2: Will all content inside the building be removed prior to the project starting A2: All contents within the 40' x 20' construction area will be removed and contents 5' to 10' beyond the floor to ceiling wall being constructed will also be removed to provide ease of access. Q3: Will the equipment and items in front of the building be moved prior to the project starting A3: There is a 30' storage container approximately 13' from the building that is not obstructing access and will remain in place. Q4: During the site visit, government personnel indicated they were going to have the inside of the building pressure washed prior to project start. Please confirm. A4: Yes, location will pressure wash interior of the 20' x 40' space only. Q5: Has a lead or asbestos survey been performed in this building If so, can the government please provide the report If not, does the government want the contractor to include surveying in their proposal A5: No lead or asbestos containing materials have been suspected/identified in this area, no survey has been completed or required for this project. Q6: If the contractor must perform a lead/asbestos survey, and positive materials are identified, will abatement be treated as an unforeseen circumstance A6: Survey will not have to be conducted Q7: During the site visit, government personnel indicated the only portion of the roof being replaced is the 60'x40' section drawn on page 6 of the SOW. Please confirm this is accurate. A7: There is being a change in scope of work for the roof. Due to the difficulty to match the existing R-Panels roofing material, it has been determined that the entire roof to include over hangs will need to be replaced. Q8: Will there be any warranty requirements on the new roofing A8: Yes, one year workmanship and manufacture warranty. Q9: Is the spray foam insulation required to be fire retardant A9: Yes. Q10: Has the government confirmed there is enough power in the building's service to accommodate the new outlets and HVAC It appears there are only two available breakers in the panel A10: There are more than enough available breakers/slots available and will be identified prior to construction. Q11: Can the government please confirm any rework or changing of lighting fixtures will NOT be part of this project A11: Changing out the light fixtures is not required for this project. Q12: SOW paragraph 1.5 calls for a 3ton unit but does not provide any expectations in terms of performance or product requirements. To provide the opportunity for competitive pricing, can the government please provide a Basis of Design or requirements for system performance A12: Energy efficient system that can provide sufficient heating and air for a 20' x 40' space Q13: Will bollards be required in front of the air condenser A13: No Q14: Will a housekeeping pad be required for the condenser If so, will a concrete pad be required or will a pre-manufactured pad be acceptable. A14: Pre-manufactured pad will be acceptable Q15: SOW paragraph 1.5 states 'air handler and evaporator coils will be suspended from ceiling I-beams.' Which room are these to be installed in A15: The 20' x 40' area being constructed Q16: Will any ductwork be required A16: Yes Q17: Is the building on a septic tank or city sewer A17: Scope of work being changed to add a drainage trench and construct a leach field- see attached drawing Q18: What kind of door and hardware does the government want installed in the newly constructed wall A18: Wooden door & frame with standard hardware Q19: SOW paragraph 1.3 calls for 'door, trim and hardware in newly constructed wall and finish painting.' Please confirm it is only the door which is being painted. A19: Door and trim to be painted to match FRP panels Q20: SOW paragraph 1.8 calls for 'FRP wall board 10' high on newly constructed wood wall.' Please confirm this is only to be installed on one side of the wall. A20: FRP on the inside of the wall, Spray foam insulation on the outside. Q21: What are the load requirements of the concrete pads A21: 30,000 to 40,000 lbs. Q22: What are the governments expectations for the PSI of concrete for pads. A22: 3000 Q23: What type of finish is required on the concrete pads A23: Broomed Q24: Does the government intend on any asphalt needing to be replaced A24: Any damage to existing asphalt will be repaired by contractor. Q25: Will the government require any compaction testing or concrete break tests A25: No, however site preparation is of the most importance for the concrete slab, remove all sod and vegetation, remove topsoil and stockpile for later use in finish grading, if subsoil is removed from around building replace with granulated fill to help drain subsurface water from building, distribute all fill, large debris free (no pit run), uniformly around site in layers no deeper than six inches and compact each layer before next layer is added. Q26: During the site visit, government personnel stated they will be washing down crop/farm equipment in the clean room. There is no drain specified in this scope of work, nor did the contractor see a drain in the area indicated. Will a drain be required for this area A26: There will be no washing down crop equipment in clean room. Drainage only required for Pecan Nut Sanitizer/Soaker (minimal amount). See response to question 17 Q27: If a drain is required for this area, it cannot be tied into any city or septic system as the user will be washing bleach, pesticides, and potentially oil/fuel/hydraulic fluid down the drain. Please indicate how the government would like to contractor to reflect this in a proposal. A27: The only additive to water will be diluted chlorine from the sanitizer, no reflection by contractor required. Q28: Will silt fencing be required A28: No, just grass seeding and straw over disturbed ground at the construction site Q29: SOW paragraph 1.10 calls for seed and straw around slab and any trenching for plumbing. Is contractor expected to provide watering services If so, for how long A29: No watering service required after project is completed and excepted by the Government Q30: Are there any permitting requirements other than a Georgia 811 dig permit A30: No Q31: Is a full-time superintendent required A31: No Q32: Will the walls and ceiling in the clean room area be framed out with 2 x 4 wooded studs If so, what type of ceiling will be required A32: No - refer to the scope of work The SOW has been updated. Scope needs to include the removal and replacement of the overhangs. Spray foam insulate the interior of the new R-Panel Roof over the newly constructed 20' x 40' area and the new R-panel roofing over the 40' x 40' north end of the building. The middle 40' x 40' area does not need to be insulated. Questions and Answers. Q1: Where is the point of connection for the domestic water A1: There are two options for the point of connection for water, one is on the east side of Bldg. 13 and the 2nd is on the north east corner of Bldg. 14 - see attached drawing Q2: Where is the Electrical Panel point of connection located A2: Electrical Panel Located approximately 25' from construction area - see PIC and Drawing. Has enough capacity for this project. Q3: What is the required spray foam R value for the walls & ceiling A3: Insulation should be at least a R38 and an inflammable rating and must be sprayed on 3" to 4" on the walls and no more than 2" on the sliding doors Q4: Door type & size Wood door and frame or Hollow Metal door & frame A4: Wood door and frame Q5: Can you clarify where the wall/ceiling painting required Above the FRP A5: finish painting of door and frame to match color of FRP panels (white). FRP only - 10' high attached to inside of newly constructed floor to ceiling wall only. Q6: Is this project located on federal property A6: Yes Q7: What are the requirements for the concrete pad Pad thickness, Concrete mix, Aggregate under slab on grade A7: 6" thick , concrete mix at 3000psi and no aggregate Q8: Are there any specifications for the new faucet A8: Brass Multi Turn Hose Bibb with 3/4 " male garden hose outlet Q9: Are there any specifications for the FRP wall board A9: 96-in x 48-in Smooth White Wall Panel with FRP Connectors, Inside & Outside Corners 10ft. to provide a sanitary seal between the seams Documents and Photos attached. In accordance with FAR 28.102-1, Performance and Payment Bonds, Policy on Use, the requirement of Bid guarantee for solicitation 12405B22Q0235, for Renovation of BLDG 14 in Bryon, GA, will be required. In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the magnitude of this contract project is between $100,000 and $250,000. A site visit has been set for Tuesday July 19, 2022 at 10:00 AM. Please send the name of the company and the names of the personnel requesting to attending to lynn.hults@usda.gov. This is a Combined Synopsis/Solicitation. The Solicitation Number 12405B22Q0235. The Associated NAICS code is 236220 (Commercial and Institutional Building Construction), with a small business size standard of $39.5 Million. USDA, ARS, FTNRL 21 Dunbar Rd. Byron, GA 31008 Needs the Renovation of Building 14. that fits the associated Statements of Work and Specifications. The Government anticipates award of a Firm Fixed Price contract. Each offer must show a breakdown giving price of each element, provide description literature or information showing that the offered service meets all parts of the Statement of Work and Specifications. Electronic submissions are preferred. Please email all quotes to lynn.hults@usda.gov. NO LATE QUOTES WILL BE ACCEPTED. To be eligible for an award, all contractors must be registered in the System for Award Management (SAM). A contractor can contact SAM by calling 1-866-606-8220 or email at www.sam.gov. NO EXCEPTIONS. A UEI (Unique Entity ID) number is required in order to register. All invoices shall be submitted and paid electronically. Quotes must be received no later that Wednesday August 10, 2022, 4:00 pm Central Standard Time (CST). Questions regarding this combined synopsis/solicitation are due no later than 3:00 PM CST on Friday August 4, 2022. Answers to any questions received by that time will be posted as an amendment to this combined synopsis/solicitation.

Details

7,920 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents