Similar Projects
Private Property Infiltration And Inflow Reduction Municipal Contractors
Bidding
Milwaukee, WI

Cold Water Fire Service Meters
Term Contract
Post-Bid
Milwaukee, WI 53202

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Weatherly Water Main Extension
Addition
Results
Oak Creek, WI 53154

2021 Watermain Replacement
Post-Bid
Glendale, WI

Water Main Relays
Results
Less than $2,216,000 est. value
Milwaukee, WI

Rawson Water Main Extension
Post-Bid
Oak Creek, WI 53172

Water Main Relays with Lead Service Line Replacement
Results
Milwaukee, WI 53200

2021 Water Main Relay Project
Post-Bid
Brown Deer, WI

Carrington Avenue and Kirkwood Avenue Water Main Replacement and Asphalt Pavement Rehabilitation
Results
$300,000 est. value
South Milwaukee, WI

Water Main Relay
Post-Bid
Less than $125,000 est. value
Greendale, WI

Sanitary Sewer Main Repair and Lining and Manhole Repair and Lining
Results
Milwaukee, WI 53200

Water Main Relays, Lead Service Relays, and Hydrant Alterations
Results
Milwaukee, WI

Lead Service Line Replacements
Results
Milwaukee, WI

Last Updated 12/11/2020 03:19 PM
Project Title

75 Lead Service Line Replacements - Winter

Physical Address View project details and contacts
City, State (County) Milwaukee, WI   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace lead service lines using trenchless methods. All locations will be emergency service line replacements due to a leak or failure. All work will be performed during winter weather months. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. . All service replacement work must be completed by March 31, 2021. All permanent restoration must be completed by April 23, 2021.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents