Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Engineering Building Utah Valley University
New Construction, Infrastructure
Bidding
$88,148,000 CJ est. value
Orem, UT 84058

RFP Construction Manager - USDC Comprehensive Therapy Building Department of Health and Human Services
New Construction, Infrastructure - 60,000 SF
Bidding
$30,500,000 CJ est. value
American Fork, UT 84003

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Sanctuary
New Construction, Infrastructure
Post-Bid
$180,000,000 CJ est. value
Lehi, UT 84043

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

Lehi Medical
New Construction, Infrastructure - 39,804 SF
Pending Verification
$23,000,000 CJ est. value
Lehi, UT 84043

Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

Last Updated 11/22/2022 05:02 PM
Project Title

Large Mammal Wildlife Crossing Detection System

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT 84005   (Utah County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Eagle Mountain City is requesting bids from responsible firms or individuals for one (1) Large mammal (>30" at shoulder height) detection system to be used off SR 73 to detect mule deer (primarily) migrating through the area and provide appropriate signage and warning systems to motorist traveling SR 73. Install Wildlife Detection System with full analytics to accurately detect medium and large size wildlife crossing the roadway and immediately activate signs to warn motorist. Target area will be 100 feet by 50 feet on each side of road for wildlife detection. System must be cable of independently tracking 4 separate zones on each side of the road and 2 separate measurement zones within the roadway. Upon accurately detecting medium to large wildlife the detection system will immediately and remotely activate 4 signs (2 Southbound Signs and 2 Northbound signs). System will also measure and log vehicle average speed, class, and count through the Wildlife Detection zone. System will log store all Wildlife Detection events and Vehicle Data for on-site collection every 60 days. System must employ passive thermal technology to detect wildlife with a false positive and false negative rate of less than 5% in all weather conditions. Question Deadline 10/13/2022 at 5:00 PM MT Construction details: o Crossing opening on the south side of SR 73 is a 45' opening o Crossing opening on the north side of SR73 is a 69' opening o Total length of crossing from opening to opening is 132' o Equipment provided to excavate access holes and bore under SR 73 and to provide power and connect system. Provided by Eagle Mountain City and or UDOT o Pipe to sleeve the cables/power provided by Eagle Mountain City and or UDOT o Poles to erect monitoring system provided by UDOT or EMC. Additional construction information and index to the attached map. 1. Project located on SR 73 within Eagle Mountain City limits @ 40.369717, -112.027601 2. System to be attached to post on the southeast side of SR 73 behind the wildlife fence located behind the wildlife/highway fence @ 40.369589, -112.027442 3. System to be attached to a post located behind the snow fence on the northeast side of SR 73 @ 40.369929, -112.027632

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents