Similar Projects
USACE Cedar Lake Pump Station
Conception
$23,300,000 est. value
Cedar Rapids, IA 52407

Water & Resource Recovery Center - RAS Pump Replacement - City of Dubuque
Renovation
Conception
$880,000 est. value
Dubuque, IA 52003

28th Avenue North Pumping Station
Renovation
Bidding
$193,405 est. value
Clinton, IA 52732

Wastewater System Improvements
New Construction, Infrastructure
Bidding
$3,450,000 est. value
Galva, IA

Mount Pleasant Northeast Lagoon Conversion
New Construction, Infrastructure
Post-Bid
Mount Pleasant, IA

Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

Auburn Court Lift Station Abandonment
New Construction, Infrastructure
Results
Bettendorf, IA

Lift Station #3 Upgrades - Phase 2
Renovation
Conception
$255,000 est. value
Waukee, IA

4th Street Pump Station and Force Main
Renovation
Bidding
$400,000 est. value
Greenfield, IA 50849

Lift Station Improvements
Renovation
Post-Bid
$550,000 est. value
Rockwell City, IA 50579

Main Lift Pump Station Emergency Repairs
Renovation
Results
Davenport, IA 52802

Briggs Woods Pumphouse Replacement
Renovation
Bidding
$300,000 est. value
Webster, IA

Proposed Wastewater Improvements Sanitary Lift Station and Forcemain to Eldon
Renovation, Infrastructure
Post-Bid
$1,238,000 est. value
Eldon, IA 52554

Green Valley Park Campground Sewer Main
Renovation, Infrastructure
Results
Less than $560,000 est. value
Union, IA

Reported 06/21/2022 02:54 PM
Project Title

Granger Creek Lift Station Improvements - 710-2607 - City of Dubuque

Physical Address View project details and contacts
City, State (County) Dubuque, IA 52001   (Dubuque County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $553,350
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for more than tripling the capacity of the existing Granger Creek List Station from 0.94 million gallons per day (MGD) to 2.9 MGD in order to accomodate recent growth (such as the extension to serve the Dubuque Regional Airport and Silver Oaks Subdivision) and planned growth (such as serving the Tamarack Business Park, Twin Ridge Subdivision, and Webber property). This improvements involve replacing and upsizing the two existing pumps, adding a third pump of similar size, and adding new force mains from the lift station to the existing Catfish Creek Lift Station. Upsizing the facility will accomodate additional development throughout the sewershed. Design of the improvements was funded in FY22 using an SRF Planning & Design Loan. This project is in included in the City of Dubuque FY 2023-2028 Capital Improvement Plan (CIP). As of June 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents