Similar Projects
Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

160'X 66" Round Steel Liner and Precast Concrete Headwall Appomattox Residency
Results
Shipman, VA 22971

EW-6 Headwalls
Results

Precast Box Culvert Wise Residency
Infrastructure
Post-Bid
Bristol, Norton, VA

Stock Class 3 Reinforced Concrete Pipe
Results
Newport News, VA

Pre-Qualification for Saint Clair Brooks Park Stream Restoration
Infrastructure
Post-Bid
Falmouth, VA 22405

Bayberry Subdivision Drainage Improvements - Phase 1
Results
Newport News, VA

Little League Fields Project
Infrastructure
Post-Bid
Tazewell, VA 24651

Country Club Road Drainage Improvements - Phase III
Results
Newport News, VA

ADS N-12 St HDPE Pipe
Infrastructure
Post-Bid
Shacklefords, VA 23156

Polypropylene (PP) Triple-Walled Pipe
Term Contract
Results
Amherst, Appomattox, Gladys, Lynchburg, Madison Heights, Roseland, Rustburg, Shipman, VA 24522

Cut Slope Stabilization US 250 Westbound
Infrastructure
Post-Bid
VA

Potomac River Hall Drainage Project
Results
Newport News, VA

HDPP Dual Walled Pipe Appomattox Res
Term Contract, Infrastructure
Post-Bid

Last Updated 05/17/2022 03:18 PM
Project Title

Z--COLO 253093 York River Shoreline Stabilization 2B

Physical Address View project details and contacts
City, State (County) Yorktown, VA   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

COLO 253093 - York River Shoreline Stabilization Phase 2B, Colonial National Historical Park, Yorktown, Virginia. This project will stabilize and rehabilitate portions of the York River shoreline that have been severely eroded. The stability of Colonial Parkway is threatened without repairs to the steep embankments that are within 25-50 feet of the Parkway. The project is design-build and includes pre- and post- construction surveys of the project area, clearing and grubbing, repositioning of existing stone, placement of riprap stone to construct rock sills, breakwaters, and revetment structures, the placement of geotextile fabric, excavation and filling earthwork, steep slope stabilization with geotextile bags and steel sheet pile wall, planting on the geotextile bag slopes, wetland fill material placement, wetland planting, and any incidental work related to the construction of this project. The project encompasses a portion of the York River shoreline between Williamsburg and Yorktown, and includes two reaches of approximately 3.1 miles with a total period of performance of 540 days. Reach 1 extends from Felgates Creek on the west to Indian Field Creek on the east, a distance of about 1.7 miles. Reach 2 extends from the mouth of Indian Field Creek on the west to the west pier of the Yorktown Naval Weapons Station on the east, a distance of about 1.4 miles. The project shall improve shoreline erosion control, stability, and natural wetland habitat for decades to come.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents