Similar Projects
Wingo Bridge Repairs
New Construction, Infrastructure
Bidding
Glenwood Springs, CO

Belford Avenue Over Happy Canyon Bridge Project
New Construction
Bidding
Parker, CO 80134

Pedestrian Bridge and Abutment Landing
Post-Bid
Colorado Springs, CO

2021 Wildin Bridge Repair and Decking Replacement
Post-Bid
Aspen, CO 81611

Bridge Inspection, Maintenance, Repair and Replacement
Term Contract
Results
Fort Collins, CO 80522

Soda Creek Pedestrian Bridge Refurbishment
Results
Steamboat Springs, CO 80477

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

20th Street Bridge Rehabilitation
New Construction, Infrastructure
Bidding
$2,300,000 to $2,800,000 est. value
Denver, CO 80238

MESA-58-M.6 Bridge Replacement Project
Post-Bid
Grand Junction, CO 81502

Park Avenue Viaduct Preventative Maintenance Phase 2
Results
$14,300,000 to $15,400,000 est. value
Denver, CO 80202

Removal of Existing Bridges E-16-HF and E-16-HE over 32nd Avenue and Replacing Them With New Bridges E-16-HFA and E-16-HEA
New Construction, Infrastructure
Bidding
$5,000,000 to $20,000,000 est. value
CO

Paseo Bridge Replacement and Trail Improvements Project
Post-Bid
Colorado Springs, CO 80903

Maroon Creek Trail Bridge
Results
$100,000 to $240,000 est. value
Aurora, CO 81611

Bridge Replacement Project
New Construction, Infrastructure
Bidding
Sterling, CO

Galvanized Bridge Decking
Post-Bid
Craig, CO 81625

Last Updated 11/23/2021 12:53 PM
Project Title

PMAA, RMSB, Willow Creek Winter Bridge, SB2001

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $343,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include the installation of a new single span steel bridge 50 ft in length and 18 ft in width, and the installation of drilled pier foundations, pier caps, and concrete abutment. Directions Take I-70 to the Empire/Granby/US 40 Exit (Exit 232). Continue on US 40 West for 26 miles. Continue on CO-125 N for 62 miles and take CO-14W to US-40W in Jackson County. Turn right onto US-40W and continue for 26 miles. Turn right onto CO Rd 129/Elk River Rd. and continue for 24 miles. The site will be on the left.

Details

Bridge, Addition.
Division 03 - Concrete, Concrete Accessories.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges.
Division 31 - Earthwork, Special Foundations, Foundation Anchors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents