Similar Projects
Rainbow Boulevard Improvements Project
Infrastructure
Bidding

Green Waste Yard Paving Project
Post-Bid
Alto, NM 88312

Base Course Fill
Post-Bid

Agua Fria Road Surfacing - Phase III
Results
$854,804 est. value
Ruidoso Downs, NM 88346

Main Road Improvements
Results
$34,646 est. value
Capitan, NM 88316

Roadway Reconstruction, Lighting
Post-Bid
Lincoln, NM

Juniper Springs Road Reconstruction
Results
Less than $326,142 est. value
Carrizozo, NM 88301

Main Road Improvements - Phase III
Alteration
Post-Bid
Capitan, NM

Roadway New Construction, New Concrete Box Culvert (CBC)
Results
NM

On Call Spray Injection Asphalt and Asphalt Maintenance Service
Infrastructure
Post-Bid
Carrizozo, NM

Roadway Rehabilitation, Roadway Reconstruction
Results
NM

Roadway Rehabilitation
Results
NM

Bridge Rehabilitation, Roadway Rehabilitation
Results
NM

Camino Coyote Lane
Results
$701,403 est. value

Bridge Replacement, Roadway Reconstruction
Results
NM

Reported 11/25/2021 12:00 AM
Project Title

Paradise Canyon Lateral Replacements and Hull Road Guardrail Replacement

Physical Address View project details and contacts
City, State (County) Ruidoso, NM   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This construction project will consist of two (2) separate projects constructed under the same contract. The two projects are as follows: Project A: Designed by Molzen Corbin: Replace approximately 80 water services from the main line to and including the angle meter stop and meter box; installation of two isolation valves. Remove and replace guard rail on both sides of Hull Road at the Cedar Creek crossing. Includes related items of concrete curb, riprap rundowns, pavement marking, and minor grading on roadway shoulders. Also includes small grade control structures and downstream culvert entry cleaning in the adjoining reach of Cedar Creek.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents