Similar Projects
CSAH 22 - Baugh Street - Reconstruction From CR 64 To CR 65 - Anoka County
Infrastructure
Conception
$7,970,000 CJ est. value
Nowthen, MN 55330

Highway 169 Frontage/Backage Road Improvements - II-01 - City of Elk River
Infrastructure
Conception
$1,500,000 CJ est. value
Elk River, MN 55330

Median Cable Barrier Installation
Infrastructure
Design
$1,900,000 CJ est. value
Clear Lake, MN 55319

Big Lake Station / Big Lake
New Construction, Infrastructure
Design
$61,000,000 CJ est. value
Big Lake, MN 55309

2023 Mill & Overlay Project Improvement Project
Infrastructure
Bidding
$600,000 CJ est. value
Otsego, MN 55330

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Big Lake, MN

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

2022 Surface Improvements
Infrastructure
Construction
$3,793,349 CJ est. value
Orrock Township, MN 55309

Norland Truck Sales
New Construction, Infrastructure - 30,300 SF
Pending Verification
$4,000,000 CJ est. value
Big Lake, MN 55309

Community Solar Garden
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Big Lake, MN 55309

Kelley Parkway/Twin Lakes Road/TH 10 Intersection - II-08 - City of Elk River
Infrastructure
Conception
$6,500,000 CJ est. value
Elk River, MN 55330

Nystrom Treatment Facility
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Big Lake, MN 55309

Clearview Elementary Site Improvements
Infrastructure
Post-Bid
$800,000 est. value
Clear Lake, MN 55319

Last Updated 07/11/2023 01:31 PM
Project Title

East-West Watermain Connection Project

Physical Address View project details and contacts
City, State (County) Otsego, MN 55330   (Sherburne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,414,741 [brand] Estimate
Plans Available from Civil Engineer - 05/17/23
Owner View project details and contacts
Architect View project details and contacts
Description

MILL BITUMINOUS SURFACE (1.5 in) 385.8 SQ YD ASPHALT 66 TON 30 in STEEL CASING PIPE (JACKED) 199 LIN FT HYDRANT 14 EACH GATE VALVE AND BOX 14 EACH BUTTERFLY VALVE AND BOX 11 EACH 12 in WATERMAIN OPENCUT 3394 LIN FT 12 in WATERMAIN DIRECTIONAL DRILL 3260 LIN FT 16 in WATERMAIN OPEN CUT 3480 LIN FT 16 in WATERMAIN DIRECTIONAL DRILL 2922 LIN FT PRESSURE REDUCING VALVE 1 LUMP SUM TOWER FILL CONTROL VALVE 1 LUMP SUM DUCTILE IRON FITTINGS 9257 POUND CONCRETE WALK 560 SQ FT CONCRETE CURB AND GUTTER 98 LIN FT SILT FENCE 7219 LIN FT SEEDING 5.2 ACRE

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents