Similar Projects
Dock Expansion - Phase II
Addition, Infrastructure - 21,000 SF
Design
Pharr, TX

Grain Dock Replacement Project
Infrastructure
Bidding
$700,000 est. value
Beaumont, TX

Fishing Pier Replacement at Fort Richardson State Historic Site
Infrastructure
Bidding
$240,000 to $293,000 est. value
Jacksboro, TX 76458

Pier 10 Redevelopment / Pier 10 and 12 Dock Repairs
Infrastructure
Post-Bid
$5,500,000 est. value
Galveston, TX

Pier 39-40 Mooring Modifications
Infrastructure
Post-Bid
Galveston, TX

Beachside Redevelopment at Galveston Island State Park
New Construction
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

Bartlett Soccer Complex Fishing Pier Improvements Project
Results
Laredo, TX 78041

Southeastern Freight Lines
Renovation
Construction
El Paso, TX 79907

Carancahua Bay Boat Ramp
Infrastructure
Bidding
$1,000,000 est. value
Edna, TX

Berth 6 Expansion Project
Infrastructure
Post-Bid
Port Arthur, TX

Keith Lake Boat Ramp Modification
Results
Beaumont, TX 77701

Sylvan Pier Repair
Infrastructure
Post-Bid
La Porte, TX

Construction Services for Perry R Bass Marine Fisheries Research Station
Results
Palacios, TX 77465

Lake Livingston Hydropower Buoy System
Alteration
Post-Bid
$500,000 est. value
TX

Medio Creek Administration Foundation Remediation and Pier Project
Results
$75,000 est. value
San Antonio, TX 78227

Reported 06/22/2022 02:52 PM
Project Title

Sugar Creek Drainage Improvements - Brunswick Drive & Fairway Drive - Dr1901 - City Of Sugar Land

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77478   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $5,950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project calls for design and construction of new reinforced concrete boxes along Brunswick Drive and Fairway Drive and diversion of flow to Longview Drive to alleviate street flooding. Inlets and laterals are also proposed to be replaced along Brunswick Drive and Fairway Drive with larger sizes. As of June 21, 2022, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents