Similar Projects
Well and Booster Pump Equipment Maintenance Service
Bidding
Goodyear, AZ 85338

Chilled and Hot Water Loop Pump Replacement for ARS Maricopa
Post-Bid
Maricopa, AZ 85138

Valentine Well
Post-Bid
Phoenix, AZ 85027

Barney Farms Lake Well and Barney Farms Tank Site Well
Results
Queen Creek, AZ

Pump Maintenance and Repair
Results
Avondale, AZ

Dry Well And Interceptor Pumping And Inspection
Post-Bid
Phoenix, AZ

Mark Wilmer Pumping Plant Unit 6 Motor Rewind
Results
Less than $3,800,000 est. value
Phoenix, AZ 85024

Trailer Mounted Water Pumps
Post-Bid
Phoenix, AZ 85003

Water Well Equipment and Services
Term Contract
Results
Tempe, AZ 85281

CMAR for Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Post-Bid
Gilbert, AZ 85297

Water Wells and Pump Maintenance and Repair Services
Results
$3,000,000 est. value
Scottsdale, AZ

Chilled Water Pump
Post-Bid
Tempe, AZ 85283

Reservoir, Pump Station and Well Conversion
Results
Gilbert, AZ 85233

Install A third (3rd) Chiller and Replace One (1) Chilled Water Pump with two (2) Chilled Water Pumps
Post-Bid
Tempe, AZ 85284

Groundwater Well Cleaning Disinfection Services
Results
$20,000 to $40,000 est. value
Phoenix, AZ 85003

Reported 02/21/2019 12:00 AM
Project Title

N--Install Variable Frequency Drive (VFD) Control Pannel on Pumps @ National Memorial Cemetery of Arizona

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85024   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor shall furnish all materials, equipment, labor and supervision necessary to install a VFD Control Panel (with an AC Unit) with three (3) Variable Drives at the National Memorial Cemetery of Arizona, 23029 Cave Creek Road, Phoenix, AZ. 85024 in accordance with the scope of work, contract drawings and per applicable standards and requirements. Completion Time: Thirty (30) calendar days from date of issuance of Notice to Proceed (NTP). Work in this project includes but is not limited to: Install one (1) VFD Control Panel with an AC unit. Connect the three existing starters in the existing Motor Control Center t;he the new Control Panel. Contractor shall provide 3-#6 power and 1-#8 ground wires from each of three existing starters to the the new VFD Control Panel and three additional sets of 3-#6 and 1-#8 ground wires from the VFD Control panels to the existing starters in the Motor Control Panel ( one set of wires is needed form each VVFD to each starter) VA to provide 3/4 conduit from POC to pilot system in existing cauldron. Contractor to provide 500 and pull 12 ga. low voltage wiring. Rebuild pumps. Clean jobsite of all construction debris. Schedule all required power turnoffs with COR, Cemetery Director and Project Manager.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents