Similar Projects
2021 Kenai Municipal Airport Airfield Drainage
Infrastructure
Results
Kenai, AK

Alakanuk Airport Apron and Taxiway Improvement - Alaska Department of Transportation & Public Facilities DOT - Northern Region
Infrastructure
Conception
$261,765 est. value
AK 99554

Rehabilitate Pavement at Taxilanes E1 and E3, and Will Reconstruct The Taxiway E/G Intersection at The Ted Stevens Anchorage International Airport
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Anchorage, AK

Hope Airport (5HO) Surface Preservation Maintenance (SPM)
Infrastructure
Results
$200,000 to $500,000 est. value
Hope, AK 99605

Extend Runway 16/34 and Construct Two Supporting Taxiways, JBER, Alaska (Jbe054)
Alteration
Post-Bid
$150,000,000 to $250,000,000 est. value
JBER, AK 99506

Design and Construction Associated with Pavement Markings for Runway 11/29, Taxiways, and Apron
Infrastructure
Results
Less than $200,000 est. value
Kake, AK

ANC Runway 7R/25L Joint Repair
Infrastructure
Results
$500,000 to $1,000,000 est. value
Anchorage, AK 99502

Chefornak Airport Rehabilitation
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Bethel, AK

Chefornak Airport Rehabilitation
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Bethel, AK

Red Devil Airport (RDV) and Kalskag Airport (KLG) Surface Preservation Maintenance (SPM)
Infrastructure
Results
$500,000 to $1,000,000 est. value
Red Devil, AK

Marshall Airport Lighting Repair
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Fairbanks, AK 99701

Airport Apron Seal 2022
Infrastructure
Post-Bid
$60,000 est. value
Wasilla, AK

Kotzebue Airport Runway Settlement Repair
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Kotzebue, AK 99752

Last Updated 07/15/2022 02:50 AM
Project Title

Brevig Mission Airport Lighting and Resurfacing

Physical Address View project details and contacts
City, State (County) Brevig Mission, AK   (Nome County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Airport Lighting, Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of resurfacing the runways, taxiway, and apron. Stabilizing slopes, rehabilitating shoulders, and applying a dust palliative. Also includes rehabilitating airport lighting.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents