Similar Projects
Corner Repair FY22-23 - Citywide ADA
Infrastructure
Bidding
$200,000 est. value
Kansas City, MO

Concrete and Brick Removal / Replacement and Complete Sidewalk Installation
Infrastructure, Alteration
Bidding
$687,130 est. value
Saint Louis, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

2021 Sidewalk Replacements
Post-Bid
Saint Joseph, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

Concrete and Brick Removal / Replacement and Complete Sidewalk Replacement
Infrastructure, Alteration
Bidding
$687,130 est. value
Saint Louis, MO

Seal and Restripe the Asphalt Parking Lots
Infrastructure
Post-Bid
Lathrop, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Moulton Street Storm Drainage Improvements
Infrastructure, Alteration
Bidding
$200,000 est. value
De Soto, MO 63020

Towne and Campus Apartment Complex-Parking Lot
Infrastructure
Post-Bid
$330,660 est. value
Rolla, MO

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

SLBE Vernon Court Sidewalks (West Side)
Infrastructure
Bidding
$300,000 est. value
Raytown, MO 64133

Last Updated 06/14/2022 12:50 AM
Project Title

Joplin ADA Ramp Improvements

Physical Address View project details and contacts
City, State (County) Joplin, MO   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of the installation of ADA ramps, landings, stairs, sidewalk, and handrail with all associated work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents