Similar Projects
Heritage Place Mixed Use
New Construction
Design
Naperville, IL 60540

Riverfront Master Plan
New Construction
Design
Plainfield, IL 60544

Buffalo Grove Parks 2021 Improvements
Renovation
Bidding
Buffalo Grove, IL 60089

Basketball Court Replacement within Emricson Park
Bidding
Woodstock, IL 60098

Sandblasting, Crack Repair and Painting
Post-Bid
Niles, IL 60714

Chestnut Avenue Improvements
Post-Bid
Glenview, IL 60026

DuPage Highlands Park Development
Results
Winfield, IL 60190

Dorothy Drennon Park
Renovation
Results
Oakbrook Terrace, IL 60181

Robin`s Nest Learning Center Park
New Construction
Construction
Marion, IL 62959

The Oak Brook Commons Mixed Use
New Construction
Construction
$500,000,000 est. value
Oak Brook, IL 60523

Ballard Farm Single Family Homes
New Construction
Design
Plainfield, IL 60544

Cardinal Drive Park Inclusive Playground
Bidding
Rolling Meadows, IL

Reforestation at Elburn Forest Preserve
Post-Bid
Elburn, IL 60119

Ben Diamond Park Playground Installation
Results
Waukegan, IL 60087

The Currents of Kankakee Riverwalk
New Construction - 56,628 SF
Design
$2,500,000 to $3,500,000 est. value
Kankakee, IL 60901

Last Updated 03/01/2021 05:59 PM
Project Title

Oswegoland Park District Boulder Point BP#2 - Structural, MEP & Enclosure

Physical Address View project details and contacts
City, State (County) Montgomery, IL 60538   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Separate Bid Packages 2-01 Air Barriers 2-02 Masonry 2-03 Carpentry / General Trades 2-04 Roofing 2-05 Sectional Doors 2-06 Exterior & Interior Glazing 2-07 Structural Steel / Misc. Metals 2-08 Exterior Sealants 2-09 Sprayed Insulation 2-10 Metal Wall Panels 2-11 Site & Building Concrete 2-12 HVAC/Controls/TAB 2-13 Electrical/Fire Alarm 2-14 Plumbing 2-15 Fire Protection

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents