Similar Projects
2022 Bond - Proposition B - McDade Independent School District
Addition, Demolition, Renovation, Infrastructure
Conception
$23,000,000 CJ est. value
McDade, TX 78650

2023 Bond - Andrews Independent School District
New Construction, Build-out, Renovation, Infrastructure
Conception
$157,000,000 CJ est. value
Andrews, TX 79714

Bandera County Annex Building Construction
New Construction, Infrastructure
Design
Bandera, TX 78003

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Widen Road - Add Lanes - SH 16
Infrastructure
Bidding
$14,958,965 CJ est. value
Bandera, TX 78003

New Palestine MNT Facility
New Construction, Infrastructure - 40,182 SF
Bidding
$12,016,221 CJ est. value
Palestine, TX 75801

HSH Surgical Ambulatory Regional Centers
Infrastructure, Build-out - 8,031 SF
Post-Bid
$1,500,000 CJ est. value
Lufkin, TX 75904

East Construction of Sitework, Fencing, Planting and Irrigation
Alteration
Post-Bid
Bastrop, TX

Paving, Drainage, Water and Sanitary for Cane Crossing Estates, Sealy, Austin
Infrastructure
Results
$5,387,371 CJ est. value
Sealy, TX 77474

Storm Water Pump Station 1 and 2 Improvements - City of Aransas Pass
Renovation
Results
Aransas Pass, TX

New Water and Wastewater Lines on South Sylvan
Infrastructure
Construction
$286,155 CJ est. value
Palestine, TX 75801

Project Echo - SpaceX Facility / Texas
New Construction, Infrastructure - 521,521 SF
Construction
$43,000,000 CJ est. value
Bastrop, TX 78602

Butler Park Apartments Multifamily Development
New Construction, Infrastructure - 68,841 SF
Pending Verification
$18,776,400 CJ est. value
Andrews, TX 79714

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

Last Updated 04/02/2023 11:37 PM
Project Title

Construction of Westwood Shores MUD, Water Well No. 2 and Well 1 Improvements

Physical Address View project details and contacts
City, State (County) Westwood, TX 75951   (Jasper County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $297,390 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and Section 1452(a)(4) of the Safe Drinking Water Act (42U.S.C. 300j-12(a)(4), as applicable . Bids will be received for a single prime Contract. Bids shall be on a unit price basis, with additive/deductive alternate bid items as indicated in the Bid Form. All qualified applicants will receive consideration for employment without regard to race, colour, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labour regulations at 41 CFR Part 60-4, relating to Construction Contractors Affirmative Action Requirements, which include the President s Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. A cashier s check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide a performance bond, a payment bond and a maintenance bond as provided for in the bid documents, for the full amount of the contract. The Owner reserves the right to reject any or all bids. Bidding and contract documents may be examined or obtained electronically. Notification of any revisions to the bid documents The Bidder is responsible for periodically checking the website for revisions. All questions must be submitted before 3:00 PM CST on July 18, 2022. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders shall submit proof of qualifications to perform the Work as described in the Instructions to Bidders.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents