Similar Projects
St. Lucie County Fire District Stations 10 & 15 Concrete & Drainage Rehabilitation
Bidding
Fort Pierce, FL 34953

Portofino Shores Lake Bank Restoration
Post-Bid
$484,650 to $530,510 est. value
Fort Pierce, FL

Ten Mile Creek Oxbow Restoration
Results
Fort Pierce, FL

Canal Maintenance
Results
Fort Pierce, FL 34945

Tilton Road Drainage Improvement Project
Results
Fort Pierce, FL 34945

Fort Pierce Inlet Artificial Reef Construction
Results
Fort Pierce, FL 34982

Summit Street at NSLRWCD Canal 8 Culvert Replacement
Results
$180,000 est. value
Fort Pierce, FL 34982

E-3 Canal Improvements - Phases 1 and 2 Construction Project
Results
Less than $5,200,000 est. value
Port Saint Lucie, FL 34984

Park and Ride Lots
Results
Less than $2,718,616 est. value
FL

Drainage Repairs and Improvements
Results
Less than $200,000 est. value

Emergency Dune Restoration and Miscellaneous Beach Services
Term Contract
Results
Fort Pierce, FL 34982

Emergency Debris Removal/Dike Repair
Results
Fort Pierce, FL 34982

Shore Protection Project, Beach Rennourishment 2021, Ft Pierce, St, Lucie County, Florida
Results
$5,000,000 to $10,000,000 est. value
Fort Pierce, FL GROUP118

Immokolee Road at FPFWCD Canal 5 Culvert Replacement
Results
$1,000,000 est. value
Fort Pierce, FL 34982

Construction of the Sagamore Storm Water Treatment Areas - East and West
Results
Less than $1,890,000 est. value
Port Saint Lucie, FL 34983

Last Updated 04/02/2020 02:16 PM
Project Title

McCarty Ranch Extension Water Quality Restoration Construction Project - Area 3

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34984   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to provide all of the labor, supervision, equipment, machinery, tools, materials, permits, transportation, utilities, and other incidentals required to complete the construction of a 290-acre water farm at the McCarty Ranch Extension. It is the general intent that the Contractor shall excavate all quantities for the construction of proposed seepage canals and perimeter berm. Areas will be cleared for excavation and placement of material to be used for the construction of a seven-foot tall above ground impoundment that will retain water that is pumped in from the proposed pump station. Additionally, the Contractor shall be required to construct three emergency overflow connections, consisting of FDOT Type “H” Ditch Bottom Inlets with 36” and 48’’ Corrugated Aluminum Pipe (CAP). The Contractor shall be responsible for the construction of the supply lines to the intake pump and for the discharge lines into the reservoir. The Contractor shall dewater the excavations to provide a dry condition during excavation and account for site drainage management during the dewatering operation. The Contractor shall provide all materials, supplies, labor, and equipment necessary for a complete project based on all specifications and amendments that may be deemed necessary. All work shall be in accordance with the Construction Plans prepared by Captec Engineering, Inc. consisting of pages 1 – 12. Combined Goal of DBE and WBE 10%

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents