Similar Projects
Wastewater Treatment Facility Upgrades Phase I Project - General Bid
New Construction
Bidding
$33,600,000 est. value
Bridgewater, MA

Wastewater Treatment Plant Upgrades
Renovation
Bidding
$750,000 est. value
Easton, MA 02356

Wastewater Treatment Facility Upgrades Phase I Project - Filed Sub Bid
New Construction
Sub-Bidding
$33,600,000 est. value
Bridgewater, MA

Wastewater Treatment Facility Improvements - Sub-Bids
Renovation
Sub-Bidding
Less than $5,000,000 est. value
Adams, MA 01220

Wastewater Treatment Facility - Alum Flow Pacing Improvements
Post-Bid
Less than $50,000 est. value
Ayer, MA

Wastewater Effluent Launder Covers
Post-Bid
Marshfield, MA

Wastewater Treatment Facility Upgrades - Filed Sub-Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Wastewater Treatment Facility Upgrades - General Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Downtown Area Wastewater Treatment Facility (WWTF) and Effluent Disposal - General Bid
Construction
$22,000,000 est. value
Orleans, MA 02653

West Stockbridge WWTP RBC Upgrades
Renovation
Bidding
$60,000 est. value
West Stockbridge, MA 01266

Capital Improvements and Long Term O and M
Post-Bid
Lynn, MA

WWTF - Septage Receiving Upgrade
Results
Less than $1,250,000 est. value
Scituate, MA 02066

Improvements to and Rehabilitation of Existing Equipment and Structures at the WWTF - General Bid
Renovation
Bidding
$5,000,000 est. value
Acton, MA

Owner`s Project Manager Services for Martha's Vineyard Airport Waste Water Treatment Facility Upgrades
Post-Bid
West Tisbury, MA

Wastewater Treatment Facility Solids Handling and Septage System Upgrades - General Bid
Renovation
Results
$2,000,000 est. value
Edgartown, MA 02539

Reported 03/23/2022 12:00 AM
Project Title

Gas Protection System Replacement, Phase II, Deer Island Treatment Plant

Physical Address View project details and contacts
City, State (County) Winthrop, MA 02152   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,350,000
Plans Available from State Agency - 01/12/22
Owner View project details and contacts
Architect View project details and contacts
Description

Gas Protection System Replacement, Phase II, Deer Island Treatment Plant. Contractor Category: Electrical. The work includes: furnishing all tools, materials, equipment, labor and supervision necessary for the removal and replacement of the fixed gas monitoring systems and modification of the control panels at the South Main Pump Station, Digesters, Upper/Lower Grit Facility, East/West Odor Control Facilities, and the Thermal Power Plant at the Deer Island Treatment Plant, in Winthrop, Massachusetts. DCAMM Certificate.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents