Similar Projects
SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

Salmon Meadows Road Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Conconully, WA 98855

Salmon Meadows Road Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Conconully, WA 98855

Methow Wildlife Area Headquarters Septic Replacement
Infrastructure
Bidding
$30,000 CJ est. value
Winthrop, WA 98862

RFP Design - Okanogan River Steelhead Kelt Reconditioning Plan
Term Contract
Bidding
Okanogan, WA 98840

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

In-Stream Fish Weir Design at Salmon Creek Road and Salmon Creek
Infrastructure
Post-Bid
Okanogan, WA

6th Street Improvements Project
Infrastructure
Results
$661,391 CJ est. value
Coulee Dam, WA 99116

Old 97, Verestar to Plata
Infrastructure
Results
$1,308,354 CJ est. value
Brewster, WA 98812

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Sitework - Portable Foundation (Structural Drawings)
Infrastructure
Post-Bid
$200,000 est. value
Okanogan, WA

Wastewater Collection System Improvements Project
Infrastructure
Results
$1,928,284 CJ est. value
Twisp, WA 98856

Salmon Creek Drainage
Infrastructure
Post-Bid
$350,000 est. value
Okanogan, WA

Last Updated 09/16/2023 03:02 PM
Project Title

Twin Lakes Secondary Source Well and Pumphouse - Phase I

Physical Address View project details and contacts
City, State (County) Nespelem, WA 99155   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Construction Cost: $35,000 - $40,000 Performance Time : 120 Calendar Days Liquidated Damages: $100.00 per Calendar Day A BID bond payable to the TRIBE must accompany each BID for five percent of the total amount of the BID. A performance BOND and a payment BOND, each in the amount of 100 percent of the CONTRACT PRICE *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents