Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

2021 Downtown Overlay and Utility Project COB Project
Infrastructure
Bidding
$1,800,000 to $2,000,000 est. value
Bothell, WA

Transmission Mains 1 and 2 Air Valve Replacement
Infrastructure
Bidding
$1,150,000 to $1,250,000 est. value
Lynnwood, WA

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

North East 49th Street Water Main Replacement North East 15th Avenue
Infrastructure
Bidding
Vancouver, WA 98682

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Tyton Joint Ductile Pipe
Infrastructure
Bidding
Walla Walla, WA 99362

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

2022 Water Hydrant
Term Contract
Bidding
Lynnwood, WA 98087

Last Updated 01/18/2022 04:41 PM
Project Title

Deduct Meter Replacement Phase 3

Physical Address View project details and contacts
City, State (County) Auburn, WA   (King County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $525,000 to $625,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of work include the removal of 66 deduct meters and the installation of 66 new irrigation meters.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents