Similar Projects
2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

2022 Capital Improvements Bond Projects - City of Little Rock
New Construction, Infrastructure
Conception
$161,800,000 CJ est. value
Little Rock, AR 72201

Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

JP Wright Loop Road Rail Grade Separation (S)
Infrastructure
Bidding
$300,000 CJ est. value
Jacksonville, AR 72076

JP Wright Loop Road Rail Grade Separation (S)
Infrastructure
Bidding
$300,000 CJ est. value
Jacksonville, AR 72076

Convert Mission Planning Cell B-380
Addition, Demolition, Build-out, Renovation, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
LrAFB, AR 72099

University of Arkansas at Little Rock (UALR) Trojan Way Early Site Package
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Little Rock, AR 72204

2021 Asphalt Overlay Program
Post-Bid
Sherwood, AR

2021 Asphalt Overlay Program
Infrastructure
Post-Bid
Jacksonville, AR

2021 Street Resurfacing Program
Results
North Little Rock, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

The East End 2021 Water Improvements Contract - 2 Water Line Improvements
Infrastructure
Post-Bid
North Little Rock, AR 72100

Sevier Street - Geyer Springs Road (CONC PVMNT PRES)
Infrastructure
Results

Last Updated 09/21/2022 04:27 PM
Project Title

Taxiway Charlie Reconstruction Program - Phase 2

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72202   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $70,754,110 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 16, 2022, this project is now under construction. Construction started at the middle of last month, August 15th, 2022, and will be completed approximately 18 to 24 months after. Processed Custom BT. trade Company app low SCHEDULE 1 WEAVER-BAILEY CONTRACTORS, INC $14,414,071.31 SCHEDULE 2 WEAVER-BAILEY CONTRACTORS, INC 16,154,709.08 SCHEDULE 3 WEAVER-BAILEY CONTRACTORS, INC $19,391,229 SCHEDULE 4 WEAVER-BAILEY CONTRACTORS, INC $20,794,100.91 The Project includes, but is not limited to, the removal of approximately 5,200 linear feet of taxiway pavement and the construction of approximately 2,700 linear feet of new concrete taxiway pavement. The removal includes approximately 22,500 SY of concrete pavement, 33,000 SY of asphalt pavement, 2,000 SY of combination asphalt/concrete pavement, 3,800 LF of drainage pipe, 2,000 LF of concrete ditch, 1,500 LF of fence removal, and the associated drainage structures, existing lighting infrastructure and pavement marking. The construction includes approximately 66,400 CY of embankment, 37,500 CY of excavation, 41,500 SY of new concrete taxiway pavement, 33,600 SY of asphalt shoulder, 9,400 SY of new concrete roads, 4,200 LF of reinforced concrete pipe, 12,200 LF of concrete ditch paving, 3,900 LF of fence, 60,000 SF of pavement marking, and the associated bases course(s), underdrains, drainage structures, taxiway edge lighting, centerline lighting, guidance signs, airfield electrical lighting infrastructure, and FAA communications infrastructure as shown on the plans and indicated in the specifications.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents