Similar Projects
Construction of Delta Heritage Trail Phase VII
Infrastructure
Bidding
$400,000 est. value
AR

New Parking Lot and Sidewalks
Infrastructure
Bidding
$300,000 est. value
England, AR 72046

Shannon Hills Safe Routes to School - Sidewalks
Post-Bid
Alexander, Shannon Hills, AR 72002

EACC Truck Driving Range
Infrastructure
Post-Bid
$125,000 est. value
Forrest City, AR 72335

Magnolia High School Drive Sidewalk
Results
Less than $127,000 est. value
Magnolia, AR 71753

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

Slaughter Pen West Parking
Renovation, Infrastructure
Pending Verification
Bentonville, AR 72712

Bull Shoals Hwy 178 Sidewalk Project
Infrastructure
Bidding
$400,000 est. value
Bull Shoals, AR 72619

Rockport Walking Trail
Infrastructure
Post-Bid
Rockport, AR

I-40 Truck Parking Expansion Project (West Memphis)
Results
AR

Construction of West Padgett Street Sidewalks
Infrastructure
Bidding
$400,000 est. value
Norphlet, AR 71759

Natural Surface Trail Services
Infrastructure
Post-Bid
Rogers, AR

2021 Paving Program, Paving of Miscellaneous Street, Trails and Parking Lots
Results
Less than $1,000,000 est. value
Searcy, AR

Wayland Holyfield Place
New Construction, Infrastructure
Bidding
$724,000 est. value
Morrilton, AR

Pavement Rehabilitation for North Heights School Parking Lot
Infrastructure
Post-Bid
$230,000 est. value
Texarkana, AR

Reported 04/28/2022 04:16 PM
Project Title

South Main Street Improvements

Physical Address View project details and contacts
City, State (County) Bentonville, AR 72712   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes, but is not limited to, the following general items of work: Narrowing So. Main Street between SW 8th Street and SW 2nd Street to a total width of 25 feet from back of curb to back of curb with a left turn lane at the intersection with SW 8th Street, including elimination of sections of existing on-street parking, adding new on-street paved parking, 12 foot wide sidewalks on both sides, crosswalks, handicap ramps, curb and gutter, trees and tree grates, and on-site and off-site underground drainage improvements along SE 3rd Street

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents