Similar Projects
Slope Stablization, Slate Run Road, Forest District #12, Tiadaghton State Forest
Post-Bid
$500,000 to $1,000,000 est. value
PA

Large Diameter HDPE Spool Extensions
Post-Bid
Williamsport, PA 17752

Flood Repairs DR-4292 - Areas 1 and 3
Results
Less than $1,000,000 est. value
PA

SR 2005 over Tributary to Muncy CRK Flood RPR 2018
Results
$500,000 to $999,999 est. value

Mill Creek Bank Stabilization and Gravel Bar Removal Project
Results
Montoursville, PA

District 3 Pipelining
Term Contract
Results
PA

Hughesville Streambank Protection Project
Results
Hughesville, PA 17737

Emergency Watershed Protection
Results
PA

SR2017 Slide Flood Repair 2018
Results
$1,000,000 to $2,499,999 est. value
PA

Muncy Creek Streambank Protection Project 101
Results
Hughesville, PA 17737

SR 1006 over Slacks Run
Results
$200,000 to $499,999 est. value
PA

Stream Bank Stabilization Contract
Results
Muncy, PA

HDPE Pipe and Landfill Gas Well Accessories
Results
Williamsport, PA

6' Diameter By 30' Long Aluminized Type II Pipes and Connecting Bands
Results
Muncy, PA

SR 3018 over 1stFrkLarrysCr
Results
$200,000 to $499,999 est. value
PA

Last Updated 07/19/2019 01:15 AM
Project Title

Flood Repairs, DR-4292 - Area 5

Physical Address View project details and contacts
City, State (County) PA   (Lycoming County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work consists of construction of a new Pleasant Stream Road alignment for approximately 4400 LF which will include installation of cross pipes, headwalls and tailwalls, base and surface DSA, an infiltration berm and tree plantings, and a precast reinforced concrete rigid frame, and associated riprap placement and guide rail installation, for the new Pleasant Stream Road crossing over Short Run. Also include is riprap placement, pipe replacement, headwall and tailwall reconstruction at pipe crossings, base and surface DSA replacement, repair of roadway washouts, ditch scour repairs, removal of existing pipe culverts and debris removal along Pleasant Stream Road. Another portion of the project will include construction of a precast reinforced concrete box culvert, and associated riprap placement and guide rail installation.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents