Similar Projects
Riverview Drive Utility Extension (TID No. 5)
Infrastructure
Bidding
$2,100,000 est. value
Black River Falls, WI 54615

North Rapids Road Watermain Installation
Infrastructure
Bidding
$690,000 est. value
Manitowoc, WI 54220

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

Bridge Deck Surface Rehabilitation, Cleaning and Epoxy Sealing
Post-Bid
Barron, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Forest Avenue Reconstruction
Post-Bid
West Bend, WI

STH 23 Utility Relocation
Results
Less than $750,000 est. value
Fond du Lac, WI

Water Service Replacement
Post-Bid
Sheboygan, WI

Water System Upgrades Contract D - 7th Street and Cincinnati Street Water Mains
Results
Less than $310,000 est. value
Albany, WI 53502

2021 Lead Service Line
Post-Bid
Fond du Lac, WI

2021 Utility Improvements - Madison Street and 25th Street
Results
Two Rivers, WI 54241

Licensed Plumbers/Utility Contractors interested in Participating in the Private Lead Service Line Program
Infrastructure, Alteration
Post-Bid
Ripon, WI

2021 Utility Improvements - 24th Street
Results
Two Rivers, WI 54241

Lift Station No.1 Dry Well Interior Refinishing
Infrastructure
Post-Bid
$30,000 est. value
Packwaukee, WI

Last Updated 05/18/2022 01:13 AM
Project Title

Bad River Scattered Sites 2022 - Individual Wells and Water Systems

Physical Address View project details and contacts
City, State (County) Ashland, WI 54806   (Ashland County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Various individual home sites in Ashland and Iron counties, Wisconsin. Home sites to be determined. Complete installation and construction of 6" drilled water wells and individual water pressure systems including water service lines and connection to individual Indian homes. Homes to be served to be determined by the Band and IHS. All homes are located in Ashland and Iron counties, Wisconsin. Davis-Bacon Wage Rates are required for this project. Contractor shall provide payroll information, as necessary, to the band for verification of compliance with Davis-Bacon requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents