Similar Projects
Midtown High-Rise Mixed-Use Development
New Construction
Conception
Phoenix, AZ 85012

Atari Hotel
New Construction
Conception
$65,000,000 to $75,000,000 est. value
Phoenix, AZ 85003

Gentry on The Green
New Construction, Demolition - 6,406,150 SF
Design
$375,000,000 est. value
Scottsdale, AZ 85251

Papago Plaza - Retail Space and Parking Garage - SIte
New Construction, Demolition - 208,000 SF
Design
$11,000,000 to $16,000,000 est. value
Scottsdale, AZ 85257

Demo White Box at Tatum Ridge
Renovation, Demolition - 2,355 SF
Post-Bid
$72,534 est. value
Phoenix, AZ 85028

Chandler Center Commons
Renovation - 1,749 SF
Post-Bid
Chandler, AZ 85251

Foothills Village Apartments
Renovation - 5,822,433 SF
Results
Phoenix, AZ 85041

DEMA Office Remodel T5516 (JIC) Single
Renovation, Demolition - 4,200 SF
Results
Phoenix, AZ 85008

The Abbey
Renovation - 53,130 SF
Construction
$7,810,110 est. value
Phoenix, AZ 85003

McDowell Road Data Center
New Construction - 16,514 SF
Construction
$48,000,000 est. value
Phoenix, AZ 85000

Tec Equipment
Renovation - 13,940 SF
Pending Verification
Phoenix, AZ 85009

Parkwest Building - Building E
Renovation - 1,385 SF
Pending Verification
Peoria, AZ 85345

Mesa Mixed-Use Development
New Construction
Conception
$28,000,000 est. value
Mesa, AZ 85203

Mercy Val Vista Center
New Construction - 99,330 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Gilbert, AZ 85297

Commerce 303
New Construction - 1,324,372 SF
Post-Bid
$24,400,300 est. value
Litchfield Park, AZ 85340

Reported 02/23/2022 11:17 AM
Project Title

El Mirage Radiant Church

Physical Address View project details and contacts
City, State (County) El Mirage, AZ 85335   (Maricopa County)
Category(s) Commercial, Religious/Funeral
Sub-Category(s) Office, Religious Facility
Contracting Method General Contractor to Subcontract.
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 6-month project will consist of a fully completed site, 20,000 SF building shell and all underslab work stubbed up into the space. All interior work will be a part of a separate contract and should be excluded from this bid. The building's steel structure will be under a separate contract and we will be responsible for the metal stud infill as well as all exterior finishes. All concrete including steel structure footings will be a part of this project.

Details

Office, 10,000 SF New Construction, Religious Facility, 10,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Window Treatments, Casework, Specialty Casework, Religious Casework, Rugs and Mats, Office Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents