Similar Projects
Last Updated | 09/23/2020 12:27 PM |
Project Title | Saratoga and Washington CSO Reduction Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Fort Mitchell, KY 41017 (Kenton County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sidewalks/Parking Lot, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to separate sanitary from the combined system to create a separate storm system to covey storm water to the newly constructed Levee crossing and directly discharge to the Ohio River during none flood stage conditions. This will also require installation of 283 feet of 30 inch storm sewer along Saratoga (RT8) to Washington and 78 feet south along Washington within the sidewalk. The project also includes the separation from combined sewer at the intersection at Third and Saratoga and Washington and Saratoga. This work is to redirect the catch basins to the storm only line with 240 feet of 15 and 18 inch pipe as shown on the Contract |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |