Similar Projects
Kenect Cleveland
New Construction
Design
Cleveland, OH 44113

2020 Haynes Street Storm Sewer Improvements
Post-Bid
Less than $389,175 est. value
Fremont, OH

Parking Lot Maintenance Phase 4 Lots A and D Sinclair Community College
Post-Bid
Less than $824,285 est. value
Dayton, OH

New Parking Lot
Results
Toledo, OH

Parking Lot Project
Results
Less than $50,000 est. value
Pickerington, OH

Fuerst Automotive
Addition - 2,000 SF
Construction
Broadview Heights, OH 44147

Parking Lot Renovation
Results
Covington, OH

The Olander Park Walking Path Project
Results
Less than $194,465 est. value
Sylvania, OH 43560

Parking Lot Maintenance, Lots A, C and D Sinclair Community College
Results
Less than $777,000 est. value
Dayton, OH 45390

Edon Northwest Local Schools Sealed Bids for 2019 Asphalt Parking Lot Resurfacing
Results
$683,000 est. value
Edon, OH 43518

Dayton FB, Parking Lot, NARA-New O&M Contract
Results
Dayton, OH 45402

Sandusky County Courthouse Ramp Project
Results
Less than $170,614 est. value
Fremont, OH

Pool Parking Lot Improvements
Results
Less than $72,000 est. value
Pickerington, OH

Concrete Ditch Replacement & Wing Wall Backfill
Results
$25,000 to $100,000 est. value
Fredericktown, OH 43019

Miscellaneous - MR 313-00.00 SRTS(Arlington)
Results
Newark, OH

Last Updated 09/23/2020 12:27 PM
Project Title

Saratoga and Washington CSO Reduction Phase 2

Physical Address View project details and contacts
City, State (County) Fort Mitchell, KY 41017   (Kenton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to separate sanitary from the combined system to create a separate storm system to covey storm water to the newly constructed Levee crossing and directly discharge to the Ohio River during none flood stage conditions. This will also require installation of 283 feet of 30 inch storm sewer along Saratoga (RT8) to Washington and 78 feet south along Washington within the sidewalk. The project also includes the separation from combined sewer at the intersection at Third and Saratoga and Washington and Saratoga. This work is to redirect the catch basins to the storm only line with 240 feet of 15 and 18 inch pipe as shown on the Contract

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents