Similar Projects
IF Mahoney Reconstruction Project
Alteration
Bidding
$765,000 est. value
Hammond, IN 46323

2021 Sidewalk Program
Post-Bid
Hammond, IN 46322

2021 ADA Sidewalk Ramp
Post-Bid
$42,150 est. value
Winfield, IN

Stationhouse and East Parking Lot - Double Track Project 3
New Construction
Results
Gary, IN

Wolf Lake Parking Expansion
Results
Hammond, IN

Accessible Ramp at E-1 in Building A
Infrastructure
Post-Bid
Crown Point, IN

Central Park Improvements - Center Core Ball-Fields and North Parking Lot
Results
Dyer, IN

CDBG 2020 Improvements
Infrastructure
Post-Bid
Lowell, IN

Sidewalk Replacement Contract A
Infrastructure
Results
$9,795,955 est. value
Griffith, IN

Pennsy Greenway Trail, Phase IV
Infrastructure
Post-Bid
Schererville, IN

Sidewalk Replacement Contract B
Infrastructure
Results
Griffith, IN

Erie Lackawanna Trail Broad Street and Alley Improvement
Infrastructure
Post-Bid
Griffith, IN

Indiana Harbor Belt Trail
Infrastructure
Results
East Chicago, IN 46312

Sidewalk and Driveway Installation, Pavement
Infrastructure
Post-Bid
Hobart, IN

Police Station Parking Lot
Infrastructure
Results
East Chicago, IN

Reported 04/28/2022 12:00 AM
Project Title

CDBG Lynnsway ADA Improvements

Physical Address View project details and contacts
City, State (County) Cedar Lake, IN   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes all labor, equipment, and materials necessary to improve the local sidewalks within the Lynnsway Subdivision in the Town of Cedar Lake as follows: Rehabilitation and reconstruction of existing concrete sidewalks and curb ramps including, concrete sidewalk removal, curb and gutter removal, HMA surface patching, curb and gutter placement, placement of concrete sidewalks and curb ramps, installation of detectable warning elements, adjusting castings to grade, and maintaining traffic and homeowner access within the Lynnsway Subdivision.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents