Similar Projects
HVAC Improvements Worcester Regional Airport (ORH) - General Bids
Bidding
Less than $1,650,000 est. value
Worcester, MA 01602

Contractor to Provide Preventive Maintenance and Service to Various HVAC Equipment
Bidding
Less than $39,000 est. value
Westborough, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Heating, Ventilation and Cooling Maintenance Service
Term Contract
Post-Bid
Winchendon, MA 01475

Elmwood A/C Chiller Rebuild and Inspection
Results
Less than $45,000 est. value
Millbury, MA

Phase II Electrical Upgrades - Sub Bids
Results
$1,500,000 est. value
Southbridge, MA

Service and Maintenance for all "Mini Split" Systems throughout the Worcester Housing Authority's Portfolio
Term Contract
Post-Bid
Worcester, MA 01605

Kitchen Exhaust Cleaning and Inspection/WPS
Term Contract
Results
Worcester, MA

Installation of A Mitsubishi Cooling and Heat Pump System
Post-Bid
$10,000 est. value
Lunenburg, MA

HVAC Annual Maintenance 2019 (School Department)
Results
Leominster, MA

Smart Burners
Post-Bid
Worcester, MA

Boiler Cleaning and Repair Services 2019
Results
Leominster, MA

Cooling Tower Replacement @ Souza Baranowski Correctional Center
Post-Bid
$300,000 est. value
Lancaster, MA

HVAC Annual Maintenance and Boiler Cleaning and Repair Services 2019 (Five Municipal Buildings)
Results
Leominster, MA

Union Station Cannabis Control Commission Headquarters - Filed Sub-Bids
Post-Bid
Worcester, MA

Last Updated 01/29/2019 02:09 PM
Project Title

Butterick Building HVAC

Physical Address View project details and contacts
City, State (County) Sterling, MA   (Worcester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Installation of a new HVAC system for 1935 vintage, 10,000 sq. ft. municipal office building located at 1 Park Street, Sterling, MA. Includes removal of the oil steam heat system and multiple York split A/C units and the installation of Mitsubishi Multi-heat pump system along with three energy recovery ventilators, electric unit heaters, one air intake hood and two exhaust units.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents