Similar Projects
Waterview Drive Warehouse
New Construction - 80,000 SF
Conception
Shelton, CT

Pepper Street Warehouse
New Construction - 28,814 SF
Conception
Monroe, CT 06468

Willard Road Mixed-Use
New Construction - 116,864 SF
Design
$10,000,000 CJ est. value
Norwalk, CT 06851

Warehouse
New Construction - 8,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bridgeport, CT 06607

Cold Storage Barn Repairs
Results
Ridgefield, CT 06877

Summer Street Warehouse
Addition - 4,605 SF
Construction
$1,000,000 est. value
Stamford, CT 06905

Lasership
Renovation - 40,000 SF
Construction
$400,000 est. value
Stamford, CT 06902

Safe & Sound Storage
New Construction
Pending Verification
Danbury, CT

Lordship Boulevard Warehouse
New Construction - 169,622 SF
Conception
Stratford, CT 06615

Nejame Plaza
New Construction - 7,000 SF
Design
$1,500,000 est. value
Danbury, CT 06810

Self Storage Facility
Renovation - 3,884 SF
Design
Bridgeport, CT

A Little More Space Self Storage Facility
New Construction, Renovation - 14,300 SF
Design
Monroe, CT

Reserve Road Warehouse
New Construction - 191,850 SF
Design
Danbury, CT

Modern Self-Storage
New Construction - 64,105 SF
Design
$2,000,000 est. value
Danbury, CT

Mini Self-Storage Facility
New Construction - 19,500 SF
Design
Greenwich, CT

Reported 04/22/2022 12:00 AM
Project Title

Pre Fab Metal Building at Stamford High School

Physical Address View project details and contacts
City, State (County) Stamford, CT 06906   (Fairfield County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed building will be a single story building with no basement. The proposed building will be erected east of the existing storage building. The structure of the building, the fasteners and the insulation has already been purchased by Stamford Public schools, and is currently in storage in Connecticut. The building will be L-shaped and will have a footprint of approximately 2,460 square feet. See Exhibits A & B for a complete scope of the project.

Details

Warehouse/Storage, 1 Story Above Grade, Approximately 2,460 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents