Similar Projects
4410--Diagnose and Repair Boiler Safety Devices
Post-Bid
Phoenix, AZ

Chiller Plant And Water Tower Maintenance And Repair
Post-Bid
Glendale, AZ

4410--644 Temporary Boiler
Term Contract
Bidding
Phoenix, AZ 85012

Collection System Odor and Corrosion Control
Results
Chandler, AZ 85225

Qualified Select Bidders List / HVAC Mechanical Yard - Lomas Elementary
Term Contract
Results
Phoenix, AZ 85044

Dual Pump Condensate Tank Unit Replacement/Installation
Term Contract
Post-Bid
Phoenix, AZ 85004

Maintenance and Repair Services, for Chilled Water Central Plants, Related Equipment and Boilers
Results
Less than $395,000 est. value
Glendale, AZ

Citywide Mechanical and Plumbing Contracting Services JOC
Term Contract
Results
$5,000,000 est. value
Scottsdale, AZ

PM for Sterizone Sterilization System VP4 and ON2 Oxygen Concentrators
Post-Bid
Phoenix, AZ 85016

H345--644-Boiler End of Life Study
Post-Bid
Phoenix, AZ 85012

Carson JR High School P.E. Hot Water Boiler Replacement
Results
Mesa, AZ 85201

Job Order Contractor For Parks And Recreation
Results
Less than $5,000,000 est. value
AZ

J046--644- Water Treatment Services
Post-Bid
Phoenix, AZ 85012

J041--644 Boiler Water Treatment
Post-Bid
Phoenix, AZ 85012

Boiler Maintenance and Repair Services
Term Contract
Post-Bid
Phoenix, AZ

Reported 06/15/2021 12:00 AM
Project Title

4410--644 Survey Design Install Boiler Quick Connects

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85012   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design and installation services to analyze the existing conditions and develop documents for the installation of a permanent emergency/auxiliary boiler connection on the exterior of the boiler plant building for an emergency/auxiliary boiler to supply 350 hp steam capacity with a working pressure of 120 psi. Location of emergency/auxiliary connection must allow for rapid installation of trailer mounted boiler with minimal disruption to the facility. The installation must accommodate dual fuel (Natural Gas and Fuel oil) emergency/auxiliary power and accommodate the existing ancillary equipment in the plant.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents