Similar Projects
King Hall Make Up Air Improvements
Alteration
Bidding
$400,000 est. value
Emporia, KS 66801

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Roberts Building HVAC Replacement
Results
$439,994 est. value
Olathe, KS 66061

Replacement of HVAC Equipment at the East Lawrence Recreations Center, Kaw River Waste Water Treatment Plant and Fire Medical Station 2
Alteration
Results
Lawrence, KS

Headworks Make-Up Air Unit Replacement HVAC Improvements
Post-Bid
McPherson, KS

Ottawa HS Chiller Replacement
Alteration
Results
Ottawa, KS 66067

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replacement of Vav Boxes in Administration Building Phase II
Alteration
Results
Less than $128,000 est. value
KS

Traulsen Blast Chillers
Term Contract
Post-Bid
Leavenworth, KS

FOSC - Move Heat Pump Unit
Term Contract
Results
$25,000 to $100,000 est. value
Fort Scott, KS 66701

Replacement of Gas Fired Radiant Heaters at the Lawrence Airport
Alteration
Post-Bid
Lawrence, KS 66044

Gas Turbine Cooling System Project
Alteration
Results
Gardner, KS

South Plant HVAC Upgrades
Alteration
Post-Bid
Lansing, KS

Replace HVAC Units at the Meadowlark and Sunflower Heights Complexes
Alteration
Results
Halstead, KS

Reported 05/25/2022 12:00 AM
Project Title

Repair HVAC Sanctuary Building 510

Physical Address View project details and contacts
City, State (County) KS   (Sedgwick County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construct repairs to the Heating Ventilation Air Conditioning (HVAC) system in Bldg 510 Sanctuary and repair the communications link between existing Bldg 510 Variable Regrigerant Flow (VRF) HVAC system and existing Direct Digital Control (DDC) system. The Contractor shall provide all labor, materials, tools, expertise, testing, surveying, equipment, reports, samples, warranties, and transportation necessary to complete the project according to the Statement of Work, plans, specifications, and contract documents. The effort will consist of a base bid and three options. The base bid work shall include the design of the system; installation of a new chiller, chilled water pump and piping for Air Handling Unit (AHU) 1 and the sanctuary including ancillary equipment; Recommissioning of AHU1; removal of abandoned duct heater: rebuilding AHU1 controls; and installing or replacing electrical circuits for the chiller and chilled water pump. Option 1 work shall include the replacement of AHU1 based on the price difference between recommissioning and replacing. Option 2 work shall include replacing the accordion-style partition wall with new drywall partition with wood door and two receptacles. Option 3 work requires consultation on the hydronic water treatment practices at McConnell AFB.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents