Reported 08/20/2021 12:00 AM
Project Title

Replacement of Penn Blowdown Separator to Boilers 1 and 2

Physical Address View project details and contacts
City, State (County) Albany, NY 12211   (Albany County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will remove, install and weld all necessary components to successfully replace 250 PSI Penn blowdown separator rated for 450 degrees in upper boiler house at Albany County Correctional Facility. All work shall be performed in accordance with all applicable building codes, standards and materials specifications including all plumbing, venting etc. The contractor shall furnish and install all necessary labor, equipment, tools and material to remove old Penn blowdown separator as well as connecting existing vent lines, water lines and blowdown lines. Contractor to provide the following: a. (1) New 250 PSI at 450 degree Penn blowdown separator b. Set blow-down separator onto existing supports. c. Remove deteriorated 1-1/2 blow-down line, replace from union. d. Connect existing 1-1/4 domestic cold water line to new separator. e. Connect and weld existing 4” vent line to separator. f. Connect existing condensate line to new blow-down separator. g. Replace blow-down line from bottom of separator with new 4” pipe and fittings from existing stub in the ground. h. Insulate all new piping with ½” fiberglass. i. Clean up all debris on daily basis.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers, Boiler Blowdown Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents