Similar Projects
Plumbing Supplies
Term Contract
Post-Bid
Liberty, MO

Concrete and Underground Plumbing
Alteration
Post-Bid
MO

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

Plumbing Services Contract for 2021-2022
Alteration
Post-Bid
Jefferson City, MO

Professional Plumbing Services
Alteration
Post-Bid
Country Club Hills, MO 63136

On Call and Emergency Maintenance Services for Plumbing
Term Contract
Post-Bid
Raytown, MO

Rex Park Restroom Plumbing
Alteration
Post-Bid
Breckenridge Hills, MO 63114

Plumbing On-Call Services
Term Contract
Post-Bid
Crestwood, MO

Plumbing Services for the Philips Park Pavilion
Term Contract
Post-Bid
Columbia, MO 65201

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

At-Risk Construction Management Services
Term Contract
Post-Bid
Blue Springs, MO

Testing, Adjusting And Balancing Proposal Package 7
Term Contract
Post-Bid
Saint Louis, MO

Kiel Garage Drain Repairs
Alteration
Post-Bid
Saint Louis, MO 63103

Rotary Twist Drain Assembly
Alteration
Post-Bid
Saint Louis, MO

Plumbing Services
Term Contract
Post-Bid
Mexico, MO

Reported 04/09/2022 12:00 AM
Project Title

Pump and Triple Duty Valve Replacement - Hazelwood Opportunity Center

Physical Address View project details and contacts
City, State (County) Spanish Lake, MO 63138   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the pump and triple duty valve at the Hazelwood Opportunity Center located at 1865 Dunn Road, St. Louis, MO 63138. Bid should include labor and material required to do the following Isolate the 25 horse power pump and triple duty valve Remove the pump and valve Remove the 40 horse power pump motor from the pump frame Hoist the existing equipment out and hoist new equipment in Re-install the new 25 horse power pump and triple duty valve Replace the bearings in the 40 horse power motor Re-install the 40 horse power motor onto the existing pump frame Startup new pump and log performance Re-insulate repair Reconnect pumps to the existing power Put unit into service.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents