Similar Projects
2022 Road Bid
Infrastructure
Bidding
$130,000 est. value
Seymour, WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Bidding
$200,000 est. value

2021 Pavement Milling and Pulverizing
Post-Bid
WI

Maple Edge Park & Patriot Park Sports Courts
Post-Bid
$160,000 est. value
Appleton, Little Chute, WI 54913

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bread Creek Village Roadway
New Construction
Results
WI 54155

Buboltz Road from County Road WW South to Hoffman Road
Infrastructure
Bidding
$300,000 est. value
WI

Hot Mix Asphalt Paving Program
Post-Bid
Grand Chute, WI

Concrete Paving
Renovation
Results
Less than $5,100,000 est. value
Appleton, WI

2021 Road Maintenance
Post-Bid
Medina, WI

2021 North Olk Street Reconstruction
Results
$210,000 est. value
Hortonville, WI 54944

New Trail Minor Block Retaining Wall Miscellaneous Grading and Riprapping Restoration
Alteration
Post-Bid
WI

Asphalt Pavement Maintenance
Term Contract
Results
Appleton, WI

Slurry Seal
Infrastructure
Post-Bid
Freedom, WI

Asphalt Pavement Reconstruction
Renovation
Results
Appleton, WI

Last Updated 06/09/2022 05:06 AM
Project Title

2022 Paving - Everglade Road

Physical Address View project details and contacts
City, State (County) Greenville, WI 54942   (Outagamie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway Reconstruction - Everglade Road: The Work includes: a. Traffic Control, b. Excavation and Grading, c. Aggregate Base Course, d. Asphalt Paving, e. Pavement Marking, f. Restoration. The work, in general, will include the approximate quantities and items listed below: • 14,000 S.Y. – Pulverize Existing Asphalt Pavement, • 14,000 S.Y. – Hot Mix Asphalt Pavement • 10,000 L.F. – Crushed Aggregate Base Shoulder, • Pavement Marking, • Traffic Control, • Landscape Restoration.Site Directions: Everglade Road from STH 76 to Greenwood Road in the Village of Greenville, Outagamie County, WI

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents