Similar Projects
Group 4-17-ST 8
Infrastructure
Conception
$5,114,012 CJ est. value
Hawley, PA 18428

SR 4010 over Shadigee Creek
Infrastructure
Conception
$250,000 CJ est. value
Starrucca, PA 18462

SR 652 Slide
Infrastructure
Design
$50,000 CJ est. value
Honesdale, PA 18431

SR 4041 over Riley Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$1,300,000 CJ est. value
Lakewood, PA 18439

Dollar General #24712 - Fair Ave / Honesdale
New Construction, Infrastructure - 10,640 SF
Bidding
$2,800,000 CJ est. value
Honesdale, PA 18431

Storm and Sewer Line Separation and Replacement Project SCI Waymart
Infrastructure
Bidding
$3,000,000 CJ est. value
Waymart, PA 18472

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Renovate and Expand Air Conditioning House Units SCI Waymart
Addition, Demolition, Renovation, Infrastructure
Results
$9,336,256 CJ est. value
Waymart, PA 18472

Municipal Building Addition
Addition, Demolition, Renovation, Infrastructure - 3,200 SF
Results
$204,597 CJ est. value
Honesdale, PA 18431

Scranton Municipal Golf Course Industrial Redevelopment
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Lake Ariel, PA 18436

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 3020 over Tributary Quinsigamund Lake
Demolition, New Construction, Infrastructure
Design
$1,150,000 CJ est. value
Waymart, PA 18472

Bucks Cove Road - Grading and Rolling
Infrastructure
Post-Bid
$200,000 CJ est. value
Dyberry Township, PA 18431

The Hideout POA - Tiki Bar and Deck Addition
Addition, Demolition, Renovation, Infrastructure
Results
$324,000 CJ est. value
Lake Ariel, PA 18436

Last Updated 06/12/2023 07:33 PM
Project Title

Cherry Ridge Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Dyberry Township, PA 18431   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,448,816 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to, cleaning and televising of approximately 17,500 linear feet of sanitary sewer mains and rehabilitation of approximately 100 manholes including, but not limited to, new frames and covers, grouting, lining/coating, and surface restoration all within Cherry Ridge Township and Texas Township, Wayne County, Pennsylvania. The extent of the Work is described in the Contract Documents, Drawings and Specifications.. CLARIFICATION DEADLINE 4/17/2023 3:00 PM The project consists of, but is not limited to, cleaning and televising of approximately 17,500 linear feet of sanitary sewer mains and rehabilitation of approximately 100 manholes including, but not limited to, new frames and covers, grouting, lining/coating, and surface restoration all within Cherry Ridge Township and Texas Township, Wayne County, Pennsylvania. The extent of the Work is described in the Contract Documents, Drawings and Specifications. Bid security shall be furnished in accordance with the Instructions to Bidders. Attention is called to the fact that prevailing minimum wage rates as determined by the Davis Bacon and Related Acts and Reorganization Plan No. 14 of 1950 must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all of the iron and steel, manufactured products, and construction materials used in the project will be produced in the United States in a manner that complies with the Build America, Buy America Requirements. The Central Wayne Regional Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw his bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents