Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Road Materials and Improvements
Infrastructure
Results
$80,000 est. value
Red Bud, IL

Resurface CH 10 from the Village of Elkton to Oakdale
Infrastructure
Results
$4,000,000 est. value
Coulterville, IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Mound Street and Miller Street Improvements
Infrastructure
Results
$546,692 CJ est. value
Sparta, IL 62286

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Water Interconnection with Transmission Main & Water Service Meter Replacement
Infrastructure
Results
$996,391 CJ est. value
Coulterville, IL 62237

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes
Term Contract
Post-Bid
$300,000 CJ est. value
Springfield, IL 62703

Mississippi River and Horse Island Chute Bridge Replacements
Demolition, New Construction, Infrastructure
Post-Bid
$177,000,000 CJ est. value
Chester, IL 62233

Jerry F. Costello Lock and Dam Tainter Gate and Monorail Bridge Rehabilitation and Painting
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Modoc, IL 62261

ComWell Building C Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Red Bud, IL 62278

RFP D/B - Chester Bridge
Infrastructure
Post-Bid
Chester, IL 62233

Lift Station Rehabilitation Project
Infrastructure
Post-Bid
$540,000 CJ est. value
Chester, IL 62233

Last Updated 06/20/2023 08:39 AM
Project Title

Patching on IL 3

Physical Address View project details and contacts
City, State (County) Ellis Grove, IL 62241   (Randolph County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,148,499 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Patching on IL 3 from the Monroe County line to the Jackson County line and on IL 150 from the Mississippi River to the Perry County line. Region 5 District 8 Federal Project # NA County(S) Randolph Key Route(S) Vaarious Marked Route(S) Section(S) DIST 8 PATCHING 2024-1 State Job #(S) C-98-133-22 Pps #(S) 8-00956-1000 Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 153 - Patching on IL 3

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents