Similar Projects
Deer Mountain Residential Redevelopment
New Construction, Infrastructure
Conception
SD

Grading, Asphalt Concrete Surfacing, Pavement Marking and Storm Sewer
Infrastructure
Bidding
$3,276,000 est. value
Nemo, SD 57759

Miller Ranch Subdivision Phase 1
Post-Bid
Spearfish, SD 57783

Creekside ES Sidewalk and Mountain View ES Asphalt Improvement
Infrastructure
Post-Bid
Spearfish, SD 57783

North Rochford Road and Hanna Road Mill and Asphalt Overlay - Phase 4
Results
$700,020 est. value
Central City, SD 57754

2021 Scheduled Street Repairs
Renovation
Results
$230,225 to $250,000 est. value
Spearfish, SD

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Surface Treatment
Infrastructure
Post-Bid
SD

Exit 8 Area Community Path Hillsview Road and S.F.P. Sports Complex
New Construction
Results
$300,000 est. value
Spearfish, SD

2022 Chip Seal
Infrastructure
Post-Bid
Deadwood, SD 57732

2021 Chip Seal
Results
$295,607 est. value
Deadwood, SD

Sampson Avenue Area Mill and Overlay Project
Infrastructure
Post-Bid
$242,000 est. value
Deadwood, SD 57732

Spearfish Sandstone Hills Street Repair and Sewer Upsize
Results
$1,455,000 to $1,569,460 est. value
Spearfish, SD 57783

2021 Crack Sealing
Results
Less than $199,717 est. value
Spearfish, SD

Reported 06/03/2022 12:00 AM
Project Title

Aggregate Crushing for the Northern Hills District

Physical Address View project details and contacts
City, State (County) Deadwood, SD   (Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment, materials, and incidentals necessary to: A) fully develop and expand quarries to the permitted limits, and B) produce and stockpile crushed gravel in the locations, quantities, quality, and gradations specified. Items considered incidental to the pay items listed in the Schedule of Items include but are not limited to the following: pit development, clearing and grubbing, topsoil removal, removal of debris and logging slash at filler material locations, and mobilization. The work shall be performed in two existing quarries located on Forest Service land.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents