Similar Projects
Madrid Lane Phase 2 Paving to Serve Coastal Point
Infrastructure
Bidding
League City, TX

37th Street Improvements Broadway to Avenue P
Infrastructure
Bidding
$6,000,000 est. value
Galveston, TX 77554

West Walker Traffic Improvement Phase II
Post-Bid
$334,202 est. value
League City, TX 77573

Water, Sanitary Sewer, Storm Sewer, and Paving to Serve Rainsong Section Three-B and Central Park Boulevard
Post-Bid
Texas City, TX 77591

Southern Region Disaster Recovery Support BPA
Results

Galveston County Road and Bridge Facility
Results
Dickinson, TX 77539

37th Street Improvements Projects from Avenue P to Seawall
Infrastructure
Bidding
$6,000,000 est. value
Galveston, TX 77554

Tiki Island Various Street Improvements
Post-Bid
Galveston, TX 77550

Texas Avenue Reconstruction
Results
Less than $4,322,000 est. value
Galveston, TX 77550

Construction of Paving Facilities in Lago Mar Pod 8 Collector Road
Infrastructure
Bidding
TX

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 9
Post-Bid
League City, TX

27th Street Improvement Project Phase III
Results
$1,700,000 est. value
Galveston, TX 77550

SH0146 - Asphalt Pavement Repair
Infrastructure
Bidding
$481,515 est. value
TX

Sanitary Sewer Water Line Drainage Facilities Paving Detention Ponds Lift Station and Force Main to Serve Westland Ranch Section 1 Section 3 Section 6 Muldoon Parkway and Maple Leaf Drive Extension
Results
TX

Mill, Overlay, Pavement Markings, Striping
Results
Less than $874,330 est. value
TX

Reported 07/10/2021 12:00 AM
Project Title

Pier 10 Redevelopment Roadways, Drainage, Illumination and Traffic Signals

Physical Address View project details and contacts
City, State (County) Galveston, TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to include furnishing materials and labor for the construction of a concrete curb and gutter roadway with associated storm sewer. The roadway will begin at the end of 14th St inside Port of Galveston property at its terminus near Del Monte's operations. It will extend to both embarkation and debarkation areas of Royal Caribbean's proposed Cruise Terminal 3. Furnishing materials and labor for the construction of roadway illumination along the proposed pavement. Furnishing materials and labor for the construction of a traffic signal at the intersection of the 14th St. Extension and the East End Cruise Corridor (EECC) Extension.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents