Similar Projects
Wrightsville Beach CSRM
Design
$10,000,000 to $25,000,000 est. value
Wrightsville Beach, NC

Eagle Island Confined Disposal Facility Improvements for Cell 1, (FY20), Brunswick County, North Carolina
Design
$10,000,000 to $25,000,000 est. value
NC

Salters Creek Maintenance Dredging
Post-Bid
Beaufort, NC 28516

Straits Landing Channel Maintenance Dredging
Post-Bid
Beaufort, NC 28516

Post-Florence Renourishment Project Phase 1
Results
Less than $19,579,550 est. value
Indian Beach, NC

Wilmington Harbor Mid-River and Military Ocean Terminal, Sunny Point Dredging
Results
$10,000,000 to $20,000,000 est. value
Wilmington, NC

Maintenance Dredging Wilmington Harbor Anchorage Basin 42 Foot & 32 Foot Project, New Hanover and Brunswick Counties, North Carolina
Design
$5,000,000 to $10,000,000 est. value
Wilmington, NC

Whittaker Creek Dredging
Post-Bid
Oriental, NC 28571

Maintenance Dredging - MHC Inner Harbor
Results
$1,000,000 to $5,000,000 est. value
Morehead City, NC 28557

W912PM20B0012 - Coastal Storm Risk Management Bogue Banks Sources Sought
Post-Bid
$25,000,000 to $50,000,000 est. value
Atlantic Beach, Emerald Isle, Indian Beach, Pine Knoll Shores, Salter Path, NC

Nourishment and Channel Dredging Project
Results
Less than $24,700,000 est. value
Topsail Beach, NC

Environmental Park Plunge Pool and Pond Riser Rehabilitation Phase 1 and 2
Post-Bid
Knightdale, NC 27545

Post-Florence Beach Renourishment Project Phase 2
Results
Less than $31,632,750 est. value
Emerald Isle, NC

Coastal Storm Risk Management (CSRM) Bogue Banks, Carteret County, N.C.
Post-Bid
NC

South Atlantic Regional Harbor Dredging
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Last Updated 07/17/2020 03:35 PM
Project Title

Coastal Storm Risk Management (Csrm) Surf City & North Topsail Beach, Topsail Island, N.C.

Physical Address View project details and contacts
City, State (County) Surf City, Topsail Beach, NC   (Pender County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing plant, labor, materials, and equipment to perform dredging, transporting, placing and shaping beach fill and performing all pre and post construction beach surveys. Approximately 10 borrow areas are available for the project and located offshore of Topsail Island Beaches from just west of Surf City to the east end limits of North Topsail Beach. The Surf City and North Topsail Beach Coastal Storm Risk Management Project consists of placing 11,510,000 CY of Dune and Berm beach fill along 28,510 LF of Surf City Beach and 23,075 LF of North Topsail Beach. The beach fill placement will occur over two dredging window seasons. The work will require a U.S. Coast Guard Ocean Certified Hopper Dredge. All beach work will not begin until 1 December and must be completed by 15 April of the following year. The project also consists of extending approximately 30 existing walkover structures in Surf City and approximately 28 existing walkover structures in North Topsail Beach and the stabilization of approximately 148 acres of new dune.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents