Similar Projects
Last Updated | 12/23/2020 08:10 AM |
Project Title | Southerly Primary Settling Tanks 1- 10 Flush Valves |
Physical Address | View project details and contacts |
City, State (County) | Cleveland, OH (Cuyahoga County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,600,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of flush valves and piping in Primary Settling Tanks Nos. 1-10; installation of 3" ductile iron NPW piping in Tunnel 8A and 3" stainless steel NPW piping in Skimmings Building No. 2 and installation of concrete fill in Skimmings Building No. 1 pump station wet well. > Cleaning and disposal of solids, grit, sludge and other materials within the channels, settling tanks and connecting conduits. Demolition and removal of existing aluminum handrails, posts and concrete. Installation of new aluminum handrailing at Primary Settling Tanks Nos. 1. Recoating of process piping within Tunnel 8A. > Replacement of existing Non-Potable Water (NPW) piping expansion joints within Tunnel 8A. Concrete repairs. Site restoration that includes seeding and mulching, sidewalk replacement and other site improvements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |