Similar Projects
Industrial Warehouse
New Construction, Demolition - 247,860 SF
Conception
Chelmsford, MA 01824

Maple Street Industrial Addition
Addition - 58,600 SF
Conception
$5,000,000 est. value
Bellingham, MA 02019

D.H. Smith & Sons Expansion
Addition - 4,000 SF
Design
$380,000 est. value
Marshfield, MA 02050

24 Drydock Avenue
New Construction - 235,500 SF
Design
Boston, MA 02210

Elevated Roots Phase II
Renovation - 22,400 SF
Post-Bid
Kingston, MA 02364

Route 20 Commercial Development
New Construction
Construction
Oxford, MA

Parallel Products Phase I & II
Addition - 45,869 SF
Construction
New Bedford, MA 02740

Iz Schwartz Appliance Warehouse
New Construction
Pending Verification
Dartmouth, MA 02747

250 Marginal Street - Freight Forwarding Development
New Construction, Demolition - 146,410 SF
Pending Verification
Chelsea, MA 02150

Aries Taunton Biosolids Gasification Project
New Construction - 18,700 SF
Design
Less than $11,000,000 est. value
Taunton, MA 02780

Einstein's Solutions Warehouse
New Construction - 4,000 SF
Construction
Fitchburg, MA 01420

Metalor PGM Expansion
New Construction - 48,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
North Attleborough, MA 02760

Auburn Commerce Park
New Construction - 145,800 SF
Design
Auburn, MA 01501

Old Right Industrial Building
New Construction - 15,112 SF
Pending Verification
Ipswich, MA 01938

Mitchell Road Industrial
New Construction, Addition - 14,400 SF
Design
Ipswich, MA

Last Updated 07/01/2022 09:15 AM
Project Title

Billerica Road Distribution Facility

Physical Address View project details and contacts
City, State (County) Chelmsford, MA 01824   (Middlesex County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method Bids by Invitation.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 30, 2022, this project is in the hearing stage. Although there is not a firm timeline, construction could begin in fourth quarter 2022.

Details

188,932 SF - Industrial Warehouse, 85,000 SF New Construction, Industrial Warehouse, 103,932 SF Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents