Similar Projects
First Floor Roof Replacement at Riverview
Renovation
Sub-Bidding
$300,000 CJ est. value
Milwaukee, WI 53202

Arlington Court 2nd Floor Roof Repair
Alteration
Post-Bid
Milwaukee, WI 53202

Green Roof Maintenance for Convent Hill and Lapham Park
Alteration
Post-Bid
Milwaukee, WI 53212

Neeskara Elementary School - Roof Replacement
Alteration
Results
Milwaukee, WI 53208

Safety Academy Reroofing
Alteration
Results
Milwaukee, WI 53209

Interpretative Center Roof Replacement Havenwoods State Forest
Renovation
Construction
$328,400 CJ est. value
Milwaukee, WI 53209

Green Roof Irrigation System Maintenance For Convent Hill & Lapham Park
Alteration
Post-Bid
Milwaukee, WI 53212

Pole Building Metal Roof Retrofit
Alteration
Results
Milwaukee, WI

Aluminum Roof Coating for Various Sites, System Wide
Renovation
Post-Bid
$300,000 CJ est. value
Milwaukee, WI 53202

Marcus Center for the Performing Arts Roof Replacement
Alteration
Results
Milwaukee, WI 53202

Replace Roof
Renovation
Post-Bid
$40,000 CJ est. value
Milwaukee, WI 53214

Fond Du Lac Transportation Building Roof Replacement
Alteration
Results
Milwaukee, WI 53210

Replace Building 6 A-Wing Roof
Renovation
Post-Bid
$1,000,000 CJ est. value
West Milwaukee, WI 53214

MCTS KK Garage Bus Storage Building Roof Replacement
Alteration
Results
Milwaukee, WI 53204

Hales Corners Fire Department Roof Replacement
Renovation
Post-Bid
$600,000 CJ est. value
Hales Corners, WI 53130

Last Updated 07/03/2023 02:33 PM
Project Title

Replace Roof

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53206   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $25,930 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish labor, material and service necessary to remove/replace roof at 3211 North 20th Street, Milwaukee, WI 53206 Kelly Duncan at 414-286-5797 or Kelly.Duncan@hacm.org - Scattered Sites Manager. 1. Safeguard property from falling objects coming from the roof. 2. Remove existing shingles, drip edge, de-icing systems, vents and any damaged or rotted roof sheathing and/or deck board on house. 3. Re-sheet roof with 4'x8'x7/16" OSB 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. Install new gutter apron in guttered areas and new drip edge on eaves as applicable. Space Gutter apron to receive gutter behind the flashing, or install gutter when installing gutter apron flashing. 6. Install new 3' wide ice and water shield at base of roof covering gutter apron on roof. Install 18" wide ice and water shield on eaves covering top of drip edge flashing. 7. Install engineered roof barrier/membrane. GAF Shingle Mate or equivalent compatible with chosen roofing system. 8. Install starter strips at base of roof and roof eaves. Step flashing (4x4x8 galvanized) should be used at all edges, chimneys and where else applicable. Note: flashing shall be installed under the shingles. All joints must be fitted tightly, accurately, and strapped securely to house and garage. Not to secure roof straps on shingles. 9. Install ridge vent. CertainTeed 12" Filtered Exhaust Vent or approved equivalent compatible with roofing system. Seal openings from any prior venting. Use manufacturer supplied cap shingles of matching color to dimensional shingles for ridge caps. Any exposed nail heads to be covered with roof caulk or tar. 10. Install new lead vent stack covers for all existing plumbing roof vents. 11. Install 30-year dimensional shingles Landmark CertainTeed, or approved equivalent. Project manager must approve the color before installation. Contractor shall use a minimum of 4 nails per shingle; nails to be sufficient in length to secure shingle, and install at a 90- degree angle to surface. Installation to follow manufacturers guidelines. 12. Provide minimum 30-year manufacturers' warranty on installed roofing system. Section 3 Plan/Policy/Compliance Forms Package (Complete/sign applicable pages and return with bid) If you have any Section 3 and/or EBE questions, please contact Konita Jude at 414-286-2940 or Kpjude@hacm.org Liquidated damages in the amount of $50.00 may be assessed for each day of delay. Contractor shall provide lien waiver to Housing Authority of the City of Milwaukee, Attention: Stacey Shaw, 809 North Broadway, Milwaukee, WI 53202.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents