Similar Projects
Clear Lake Sea Wall Masonry Repairs
Alteration
Bidding
Clear Lake, IA

2022 Riverwalk Improvements - Balustrade Replacement
Alteration
Bidding
Des Moines, IA

Board Up Contract
Term Contract
Post-Bid
Davenport, IA

Grant Wood Siding Replacement
Alteration
Post-Bid
Less than $250,000 est. value
Iowa City, IA 52240

Tipton Library Exterior Stair Replacement
Results
Tipton, IA 52772

Fairmount Library Masonry Repairs
Alteration
Results
Davenport, IA

Ola Babcock Miller Tuckpointing
Alteration
Post-Bid
Des Moines, IA 50319

ICCSD 2021 Buford Garner Wall Panel Replacement - Phase 2
Alteration
Results
$225,000 est. value
North Liberty, IA 52317

Innovative Teaching and Technology Center Roof Replacement and Exterior Repairs
Alteration
Post-Bid
Less than $4,900,000 est. value
Cedar Falls, IA

Facilities Management Overhead Doors
Alteration
Results
$110,100 est. value
Cedar Falls, IA

DMPS Smouse Opportunity School Exterior Improvements
Alteration
Post-Bid
Des Moines, IA 50312

Camp Dodge Building M-15
Renovation, Alteration
Results
Johnston, IA 50131

Treatment Center EIFS Replacement
Alteration
Post-Bid
Rockwell City, IA 50579

Doors for Auxiliary Site
Alteration
Results
Davenport, IA 52802

Ho-Chunk to Heritage Parking Ramp Skywalk Upgrades
Alteration
Post-Bid
Sioux City, IA 51101

Last Updated 03/29/2022 08:05 AM
Project Title

Water Treatment Facilities, Exterior Wall Repair and Repointing

Physical Address View project details and contacts
City, State (County) Boone, IA   (Boone County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Masonry, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements in Boone, Iowa under one contract with two Divisions (if both are awarded) generally described as follows: Division 1 – Water Plant Building: Work consists of masonry restoration, creating new movement joints, installing a new insulated furring system on the outside of the exposed precast beam at the top of the north facing wall, and replacing north wall windows with aluminum storefront type windows, or as an alternate, translucent panels. Masonry restoration will include repointing cracked mortar joints inside and outside of wall as designated on plan, replacing cracked face shells with new masonry units, and applying masonry sealer to north and west walls of the building. Division 2 – Pump Station Building: Work consists primarily of masonry restoration and creating new movement joints. Repair cracks in mortar joints, replace cracked face shells, cut and apply joint sealant to new control joints in masonry walls, replace broken glass block window, and apply masonry sealer to entire structure after masonry repair work is complete.

Details

Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents