Similar Projects
Production Line Upgrades
Term Contract
Bidding
White Hall, AR 71602

2" Galvanized Water Main Replacements
Infrastructure
Bidding
$1,100,000 est. value
Little Rock, AR

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

Balboa Gate Emergency Connection Water Line
Alteration
Bidding
Garfield, AR

Highway I-49 18 Water Main Extension
Infrastructure
Post-Bid
Rogers, AR

Highway 9 Water Line Relocation
Results
Salem, AR

Installation of 12inch Diameter Ductile Iron Pipe Crossing I-40 Harris Road
Infrastructure
Bidding
Little Rock, AR 72223

Dierks Water and Sewer Improvements
Infrastructure
Post-Bid
$165,000 est. value
Dierks, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

Construction - Township Pump Station and Waterline
New Construction, Infrastructure
Bidding
Fayetteville, AR

2021 Water Main Extensions
Infrastructure
Post-Bid
Searcy, AR

Construction of the Highway 141 Water Line Relocation
Infrastructure
Results
Paragould, AR

Reported 02/11/2022 12:00 AM
Project Title

Bldg. 65 Sanitary Sewer Line

Physical Address View project details and contacts
City, State (County) North Little Rock, AR 72114   (Pulaski County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, equipment, materials, testing, site investigations, supervisory, and professional services to perform all work associated with repair of gravity sewer in MH 002, MH288, and MH 64, and install outdoor duplex swage grinder system, and backwater valve with housing and cleanout outside of building 65. This project will consist of, but not limited to, work which include cleanout of gravity sewer line system, verification of the existing conditions (video to locate areas(s) of repair), sectional or full trenchless HDPE pipe installation or complete excavation and replacement of 8” sewer pipe between MH002, MH288, and MH64 (~292’ total linear length). The contractor shall locate area where to install outdoor duplex swage grinder system, backwater valve with housing, cleanout access, and full port valve downstream of cleanout outside between building 65 and MH288.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents