Similar Projects
PW 1814 South Plant Well 1 Modification
Alteration
Bidding
$481,000 est. value
Winter Park, FL 32792

Veterans Park Well Installation
Infrastructure
Bidding
Bristol, FL 32321

Coral St LS45 Pump Replacement
Post-Bid
Navarre, FL 32566

Sump Pumps
Post-Bid
Lakeland, FL 33801

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Oak Meadows Water Supply Facility Well Houses
Results
Less than $2,000,000 est. value
Orlando, FL 32835

Drill and Install Well - San Antonio Sports Complex
Infrastructure
Bidding
San Antonio, FL 33576

Solid Waste Flygt Pump
Post-Bid
FL

Aquifer Recharge at Flatford Swamp
Results
FL

Cypress Bridge Wellfield Improvements Project
Infrastructure
Bidding
Tampa, FL

Pump W/1" NPT Ports
Post-Bid
Lakeland, FL

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Multi-Year Contract for Repair of Electrical Motors and Pumps
Term Contract
Bidding
Atlantic Beach, FL

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Wells and HSP Pump Services
Term Contract
Results
Orlando, FL 32801

Reported 09/03/2021 12:00 AM
Project Title

Purchase and Installation of Well Pump and Motor

Physical Address View project details and contacts
City, State (County) Plant City, FL 33563   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor and materials necessary to perform the well pump replacement to meet the existing condition at Well 6 located in the Plant City WTP 2. The work shall include but is not limited to the following: 1. Submit proposed bowl and column pipe assembly shop drawings for review. 2. Submit factory pump test results (non-witnessed). 3. Procure new well pump and column pipe assembly. 4. Remove and dispose of existing well pump. 5. Conduct video survey of well 6. Disinfect well per AWWA standard C654. 7. Install new pump and column pipe assembly, one (1) stainless steel tube (Food graded) transducer pipes to be strapped to the column pipe with stainless steel strapping. 8. Perform witnessed field operation and vibration tests to verify pump functionality.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents