Similar Projects
Last Updated | 10/10/2023 03:09 PM |
Project Title | Indefinite Delivery Indefinite Quantity (IDIQ) Contract for: Gas Piping Restoration, Asbestos Investigation, Air Monitoring and Asbestos Abatement |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10007 (New York County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | All Sub-Bids Received, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A non-mandatory virtual Pre-Bid Conference will be held on Wednesday, August 10, 2022, at 11:00 AM, (remotely via Microsoft Teams). Although attendance is not mandatory, it is strongly recommended that all interested Bidders review the bid documents in advance of this meeting. To participate in this meeting, please utilize one of the following three options: Option 3: call in (audio only) +1 646-838-1534,,762461768# United States, New York City Phone Conference ID: 762 461 768# RFQ Question Submission Deadline 8/12/22 Question and Answer Release Date 8/17/22 Rebids - The scope of work under this contract is to restore gas services by replacing existing interior piping and when required underground gas distribution piping between buildings up to and including building shutoff valve and includes but not limited to the following: 1. Core boring and drilling. 2. Removal and installation of piping, fittings and valves. 3. Stove hook-up. 4. Fire stopping. 5. Inspections. 6. Plastering and sheet rock removal and restoration. 7. Landscaping where necessary. 8. Permit filings. 9. Registration with applicable utility companies. 10. Provide all required excavations, including hand excavation. 11. Concrete and pavement cuttings. 12. Shoring, trenching and backfill. 13. Supports for excavated pipes and conduits. 14. All other lines that may exist underground for the underground gas service piping replacement (if it is required to be replaced by utility company) from the property line to the point of entry (POE) of the building. 15. Coordinate the point of entry (POE) for the building with the utility company. The excavation, backfilling and shoring should be in accordance with the requirement of the serving utility company, NYC buildings code and gas fuel. 16. Perform Asbestos Investigation and Abatement as required including all necessary Regulatory filings (Refer to SOW in Appendix A & B). 17. Provide Independent 3rd Party Air Monitoring for abatement work (Refer to SOW in Appendix A). Please Note: This Contract shall be subject to the New York City Housing Authoritys Project Labor Agreement and, as part of its bid, the Bidder must submit at the time of bid submission: (1) a Letter of Assent to the Project Labor Agreement signed by the Bidder; AND (2) Letters of Assent signed by each of the Bidders proposed Subcontractors. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |