Similar Projects
Last Updated | 11/27/2022 11:03 PM |
Project Title | All Seasons Water Users District System IV to System I Pipeline Connection |
Physical Address | View project details and contacts |
City, State (County) | Bottineau, ND 58318 (Bottineau County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $16,640,102 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of WORK consists of two (2) Bid Schedules. The contract will be awarded under only one Bid Schedule. The Owner reserves the right to award the Contract, if awarded, that is the most advantageous and in the best interest of the Owner. Bid Schedule No. 1 generally consists of furnishing and installing approximately 37.3 miles of 8" through 3" ASTM D2241 PVC gasketed joint pipe, road crossings; connections to existing pipelines, two prefabricated steel booster stations and other related appurtenances. Bid Schedule No. 2 generally consists of furnishing and installing approximately 37.3 miles of 10" through 3" IPS HDPE poly pipe, road crossings; connections to existing pipelines, two prefabricated steel booster stations and other related appurtenances. The project is located in Bottineau and Rolette Counties of North Dakota. All Bids must be made on the "Bid Form" included as part of these documents. Each BID must be accompanied by a separate envelope containing a copy of a current and valid North Dakota Contractor's License (must have been issued at least 10 calendar days before the date of Bid opening) and a BIDDER's Bond equal to five percent of the full amount of the BID, executed by the BIDDER as Principal and by a SURETY, conditioned that if the Principal's BID is accepted and the CONTRACT awarded to the Principal, the Principal, within fifteen days after notice of award, shall execute a CONTRACT in accordance with terms of the BID and a CONTRACTOR's BOND as required by law and the regulations and determinations of the All Seasons Water Users District. Bidders on this work will be required to comply with the Presidents Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the contract documents. Bidders on this work will be required to comply with Title 40 CFR Part 33 - Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. The Owner reserves the right to hold all bids for a period of 61 days after the date fixed for the opening thereof, and to reject any or all bids, and to award the Contract, if awarded, to the Contractor with the Bid that is determined to be in the best interest and most advantageous to the Owner. Goals for minority participation in each trade - __________ Goals for female participation in each trade - __________ Bid Result Total Bid Schedule No. 1 - Wagner - $8,118,016.00 Total Bid Schedule No. 2 - Wagner - $8,522,086.00 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |