Similar Projects
Buena Vista Community Phase 2 Wastewater System Improvements
Renovation
Bidding
$580,000 est. value
Missoula, MT

Basin View Pipeline
Infrastructure
Bidding
$25,000 to $150,000 est. value
Miles City, MT

Removing and Replacing 9 Sewer Manholes
Infrastructure
Post-Bid
Helena, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Construction of Park Avenue Sewer Main Extension
Infrastructure
Results
Stevensville, MT

Phase Two Sanitary Sewer Interceptor Replacement
Infrastructure
Results
Billings, MT

Fort Peck Housing Authority 2022 Developments
Infrastructure
Bidding
$300,000 est. value
Poplar, MT

Terminal Sanitary System Improvements at Glacier Park International Airport
Infrastructure
Post-Bid
$220,000 est. value
Kalispell, MT 59901

Lewis and Clark State Park Comfort Station Septic
Infrastructure
Results
$466,000 est. value
Whitehall, MT

Drainfields
Infrastructure
Bidding
$100,000 to $250,000 est. value
Crow Agency, MT

Schedules 1-4, Water and Sewer Main Replacement
Infrastructure
Post-Bid
Billings, MT

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

ADLC Daly Addition Road Improvements Project
Alteration
Post-Bid
Anaconda, MT

MLC Sewer and Water System Improvements
Infrastructure
Results
Helena, MT 59602

Bannack and Clarkes Lookout State Park Septic and Vault Pumping
Term Contract
Post-Bid
Dillon, MT 59725

Reported 07/07/2022 04:36 PM
Project Title

North Frontage Road Interceptor - WWIF20 - City of Bozeman

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59718   (Gallatin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2026
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace or parallel 11,500' of the north frontage road interceptor between springhill rd and bridger dr. Portions of the interceptor are at or very near capacity and unles - improvements are made it will be at or over capacity when the tributary obligated areas are developed. This project will directly increase collection capacity in the southeast and east part of town within the community plan boundary as well as the east part of town will be tributary to this north frontage road interceptor. There are potentially a great number of private development projects which will not be able to proceed due to the lack of wastewater collection capacity. This project will conform to the city's wastewater master plan. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of July 6, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents