Similar Projects
Construction of Stormwater Basin Expansion I-179
Infrastructure
Bidding
$3,500,000 to $3,700,000 est. value
Torrance, CA 90504

2022 Catch Basin Retrofit Device Installation
Infrastructure
Bidding
$6,000,000 est. value
Monterey Park, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Maintenance of the Cerritos Sewer System
Alteration
Post-Bid
Cerritos, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Sanitary Sewer Rehabilitation And Replacement Program Project 7 (SSRRP-7)
Infrastructure
Results
$641,876 est. value
Long Beach, CA 90899

Marie Canyon Green Streets Improvements Project
Infrastructure
Bidding
$300,000 est. value
Malibu, CA

Shoemaker Avenue Trunk Sewer Rehabilitation
Alteration
Post-Bid
$750,000 to $1,250,000 est. value
Norwalk, Santa Fe Springs, CA 90659

Construction Of District 5 Interceptor Sewer Rehabilitation Phase 1
Alteration
Results
$2,600,000 to $3,900,000 est. value
Torrance, CA

Stormwater Facilities Master Plan
Infrastructure
Post-Bid
Carson, CA

Construct Storm Water Treatment Devices and Imported Borrow
Infrastructure
Results
$4,900,000 est. value
CA

Storm Drain Catch Basin Inserts
Infrastructure
Post-Bid
Inglewood, CA 90301

Storm Water Drain Water Pump Services in Los Angeles and Ventura Counties
Infrastructure
Results

Construct Pollution Infiltration Areas and Austin Vault Sand Filter
Infrastructure
Results
$3,680,000 est. value
CA

Storm Water Drain Water Pump Services
Infrastructure
Results

Last Updated 05/20/2022 06:55 AM
Project Title

Storm Drain Inlet Insert Installation FY2021-22

Physical Address View project details and contacts
City, State (County) Glendora, CA   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $158,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project entails cleaning existing catch basins, furnishing and installing connector pipe screens on existing catch basins, and repairing damaged catch basins.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents