Similar Projects
0.5 MG Elevated Water Tank - Rehabilitation - 19-WAT-050 - City of Fergus Falls
Renovation, Infrastructure
Conception
$750,000 CJ est. value
Fergus Falls, MN 56537

"OLD" Wastewater Treatment Plant - Abatement/Demolition - 10-SAN-028 - City of Fergus Falls
Demolition, Infrastructure
Conception
$800,000 CJ est. value
Fergus Falls, MN 56537

Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$2,700,000 CJ est. value
Fergus Falls, MN 56537

Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$2,700,000 CJ est. value
Fergus Falls, MN 56537

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pelican Rapids Facilities Upgrades Aquatic Center
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Pelican Rapids, MN 56572

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

County-wide Pavement Markings
Results
MN

CSAH 35 Reconditioning
Renovation
Results
MN

New York Mills Southpoint Apartment
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
New York Mills, MN 56567

2023 Utility and Surface Improvements
Infrastructure
Bidding
$250,000 CJ est. value
Henning, MN 56551

DNR Paul Lake Public Water Access (PWA) Parking Lot Repair
Infrastructure
Post-Bid
$300,000 est. value
Perham, MN 56573

CSAH 46 and CSAH 95 Improvements
Infrastructure
Results
Parkers Prairie, MN

DNR Big Pine Grandview Public Water Access Parking Lot Repair
Infrastructure
Post-Bid
$200,000 est. value
Perham, MN 56573

Last Updated 02/22/2023 02:04 AM
Project Title

Reconstruction, Sidewalk and ADA Work - TH 108

Physical Address View project details and contacts
City, State (County) Henning, MN 56551   (Otter Tail County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $4,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

4th St in Henning to TH 210--reconstruction, sidewalk & ADA work As of February 22, 2023, the project is in Conceptual status. Anticipated letting date is November 17, 2023. MNDOT - Reconstruction, Sidewalk and ADA Work - TH 108 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents